News   GLOBAL  |  Apr 02, 2020
 9.7K     0 
News   GLOBAL  |  Apr 01, 2020
 41K     0 
News   GLOBAL  |  Apr 01, 2020
 5.5K     0 

  1. K

    Toronto Toronto | Forma | 308m | 84s | Great Gulf | Gehry Partners

    That is true. I wonder if, like the one, they will build a temp staging platform after they finish excavation.
  2. K

    Toronto Toronto | The One | 308.6m | 85s | Tridel | Foster + Partners

    It looks like the 31st floor has been prepared and it will likely get poured Monday.
  3. K

    Toronto Toronto | The One | 308.6m | 85s | Tridel | Foster + Partners

    As can be seen from the photos above, cladding work can’t continue till the construction of the protective/work platform is done. This requires street closures and other logistical issues that have to be scheduled. See the post #14799 for dates when the will likely do this.
  4. K

    Toronto Toronto | Concord Sky | 299m | 85s | Concord Adex | Kohn Pedersen Fox

    Yes but by comparing the pics by @Red Mars and @j_yyz above you can see noticeable progress and so either they are not complying with the stop order or they have obtained their permits.
  5. K

    Toronto Toronto | Forma | 308m | 84s | Great Gulf | Gehry Partners

    From today. It is getting to the fun/serious part of constructing this thing. With large sites, it would take ~ 4 months to excavate 4 levels so we will see how fast this progresses given the small lot and tight location they have to work with. In any event, we should see a crane popping up...
  6. K

    Mississauga Toronto | M3 at M City | 260.29m | 77s | Rogers Real Estate | Arcadis

    Once interest rates come down enough, I wouldn’t be surprised if Oxford’s SQ1 District or Exchange South try to outdo M3.
  7. K

    Mississauga Toronto | M3 at M City | 260.29m | 77s | Rogers Real Estate | Arcadis

    I think it will be the 3rd tallest. M4 is only 216m while the tallest Exchange tower will be 232m.
  8. K

    Mississauga Toronto | Exchange District Condos | 232m | 72s | Camrost-Felcorp | Arcadis

    Making their presence felt already with more than a dozen more towers planned for the area.
  9. K

    Mississauga Toronto | M4 at M City | 215.6m | 67s | Rogers Real Estate | Core Architects

    I think they are pouring the base for a crane(s). But not sure they are using the most efficient method - pouring concrete into buckets ( including an excavator’s) then driving them down the pit. I imagine the cement trucks may not be able to climb the steep ramp.
  10. K

    Toronto Toronto | Forma | 308m | 84s | Great Gulf | Gehry Partners

    This one should have only 4 underground levels whereas the second/taller tower has 6.
  11. K

    Toronto Toronto | Forma | 308m | 84s | Great Gulf | Gehry Partners

    I am not sure how many underground levels the previous building had but they only excavated/removed what looked like 1 level as can be seen in this photo by @jer1961
  12. K

    Toronto Toronto | Forma | 308m | 84s | Great Gulf | Gehry Partners

    More equipment on site?
  13. K

    Mississauga Toronto | M3 at M City | 260.29m | 77s | Rogers Real Estate | Arcadis

    The podium crane has been removed. Very soon this will start moving up at pace of 1 floor/week. Accounting for holidays and weather delays, the remaining 70 floors would take 18 months and thus it should top out by end of 2024.
  14. K

    Toronto Toronto | The One | 308.6m | 85s | Tridel | Foster + Partners

    They have finished 29 floors and are currently setting up forms for the 30th floor.