News   GLOBAL  |  Apr 02, 2020
 10K     0 
News   GLOBAL  |  Apr 01, 2020
 42K     0 
News   GLOBAL  |  Apr 01, 2020
 6.1K     0 

  1. Leo_Chan

    Richmond Hill Yonge Line 1 North Subway Extension | Metrolinx

    While I disagree with the section between Steeles and Finch being a bus Rapidway, the section between Highway 7 and Steeles could have been a great showcase of the benefits of dedicated bus lanes and signal priority, which could have lead to more dedicated bus lane projects around the region...
  2. Leo_Chan

    Richmond Hill Yonge Line 1 North Subway Extension | Metrolinx

    I think the idea of the "Bridge-center" station between Highway 7 and Highway 407 is neat. It makes use of that dead space and has great potential for transfers to the Richmond Hill Line. Would it be considered a partially elevated bus terminal? I think the station at High Tech Road is fine as...
  3. Leo_Chan

    Roads: GTA West Corridor—Highway 413

    Would making Highway 407 free to use or reduce tolls by 90% result in more benefit to the economy than building Highway 413? Even if it costed 5 times more to do so?
  4. Leo_Chan

    YRT/Viva Construction Thread (Rapidways, Terminals)

    I don't think the suggestion is that controversial. It's not like I'm suggesting to remove left turns from the entire corridor and require U-turns. I always thought that render was of Yonge and Highway 7, not Major Mackenzie.
  5. Leo_Chan

    YRT/Viva Construction Thread (Rapidways, Terminals)

    I think reconstructing the intersection is the only solution here and it doesn't even have to be much. To obtain more space, the northbound left turn lane can be closed and traffic can turn one light earlier at Hopkins Street with a new traffic signal added at Atkinson Street to turn onto Major...
  6. Leo_Chan

    407 Transitway

    I wonder if the 407 Transitway will allow for any bus only ramps on Highway 400? The existing plans don't seem to have anything. Currently, there is no easy way for those busses to serve the Highway 407 Station terminal.
  7. Leo_Chan

    Metrolinx: Sheppard East LRT (In Design)

    LRT is a spectrum of different implementations of public transit operations with different priority and vehicle types. It can range from mixed traffic, on street corridor with signal priority, grade separated right of way with some on street operations, all the way to fully grade separated...
  8. Leo_Chan

    Roads: GTA West Corridor—Highway 413

    Highway 413 should be added to this thread's name.
  9. Leo_Chan

    YRT/Viva Construction Thread (Rapidways, Terminals)

    You see those two people walking north towards Major Mackenzie at 20:17? They are walking towards the Major Mackenzie rather than south to take the actual way. This is a major transfer location, so making people walk further is an inconvenience.
  10. Leo_Chan

    Toronto Toronto | Bloor–Danforth Line 2 Scarborough Subway Extension | ?m | ?s | Metrolinx

    Since we're talking about what "could have been", here's my take:
  11. Leo_Chan

    Toronto Toronto | Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    More images from https://blog.metrolinx.com/2020/11/16/torontos-new-union-station-bus-terminal-gets-ready-to-open-heres-what-you-need-to-know-to-get-on-the-bus/
  12. Leo_Chan

    Toronto Toronto | Ontario Line 3 | ?m | ?s | Metrolinx

    From the above article: I think the best thing that came out of this review is that the Osgoode and Queen station platform are not in the centre area between the two lines (City Hall focused). From the image, the Ontario Line's Osgoode platform is a lot to the west, which is good assuming...
  13. Leo_Chan

    Toronto Toronto | Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    There will be a north and a south connector, but I think they were looking for a central connector that connects both Bay Teamways underground, potentially connecting with the streetcar station without going into the fare paid zone. It might take longer to travel compared to the south connector...
  14. Leo_Chan

    Brampton: Queen Street RT

    Is Zum 501 terminating at VMC station actually a good service pattern? Is there any merit to terminating at Highway 50 and transferring to Viva Orange instead? I know those from Brampton taking the subway will complain that they have to transfer, but isn't having BT going that deep into YRT...
  15. Leo_Chan

    Cycling infrastructure (Separated bike lanes)

    Add the images as thumbnails, not full image.
  16. Leo_Chan

    Roads: Ontario/GTA Highways Discussion

    I think that was the idea decades ago. However, since land prices have increased, more bridges for elevated (or tunneled) ramps are cheaper than using more land for highways.
  17. Leo_Chan

    Richmond Hill Yonge Line 1 North Subway Extension | Metrolinx

    Do you mean along Yonge between Highway 7 and Finch? That's been ruled out over a decade ago when the Provincial Government announced potential funding for the subway extension. If you mean fully connecting the existing parts of the rapidways, such as Highway 7 West between Dufferin and Bowes...
  18. Leo_Chan

    Richmond Hill Yonge Line 1 North Subway Extension | Metrolinx

    This whole thread has become off topic.

Back
Top