News   GLOBAL  |  Apr 02, 2020
 9.8K     0 
News   GLOBAL  |  Apr 01, 2020
 41K     0 
News   GLOBAL  |  Apr 01, 2020
 5.6K     0 

  1. Space Gary

    Toronto Toronto | Ontario Line 3 | ?m | ?s | Metrolinx

    Good to see SEM is commencing!
  2. Space Gary

    Toronto Toronto | Ontario Line 3 | ?m | ?s | Metrolinx

    Do you mind sharing the link to these drawings?
  3. Space Gary

    GO Transit: Construction Projects (Metrolinx, various)

    Some pretty serious iron working to install new culverts at King City GO!
  4. Space Gary

    Danforth Line 2 Scarborough Subway Extension

    The intervention headwall is basically a thick, low-strength concrete wall of secant piles that the TBM can drive into and depressurize the cutter head and allow maintenance work / tool changes to be performed safely. Not sure if this is what they're doing in this context or if they're merely...
  5. Space Gary

    Toronto Toronto | 75 Broadway Avenue | 117.34m | 38s | Hazelview | WZMH

    Tower crane coming down right now ... courtesy of the largest mobile crane in Ontario!
  6. Space Gary

    Toronto Toronto | Gilgan Family Queensway Health Centre | 45.1m | 9s | Trillium Health Partners | Stantec

    Tower crane going up with the help of a mobile crane from Mammoet on the new build.
  7. Space Gary

    Vaughan Toronto | Charisma Condominiums Phase 2 | 104.97m | 29s | Greenpark | Core Architects

    Mammoet has a mobile crane on-site to remove the remaining tower crane.
  8. Space Gary

    Toronto Toronto | Eglinton Line 5 Crosstown West Extension | ?m | ?s | Metrolinx

    Managed to catch the LR 1600 crane hoisting the bottom half of the TBM shield out of the shaft this afternoon, unreal to watch!
  9. Space Gary

    Toronto Toronto | Eglinton Line 5 Crosstown West Extension | ?m | ?s | Metrolinx

    Is there a crane on-site yet to lift the TBMs out of the shaft?
  10. Space Gary

    Toronto Toronto | Lower Don Lands Redevelopment | ?m | ?s | Waterfront Toronto

    Passed by the Port Lands on a Via train into Union this evening and saw some mobile crane parts (seemed to be luffing jib sections and y-guys) on flatbed trailers in a parking lot at the corner of Lake Shore and Cherry, anyone know if this is related to the current construction or maybe demo of...
  11. Space Gary

    Toronto Toronto | Ontario Line 3 | ?m | ?s | Metrolinx

    https://www.infrastructureontario.ca/en/news-and-media/news/subway-ontario-line-elevated-guideway-and-stations/agreement-signed-for-ontario-line-elevated-guideway-and-stations/

Back
Top