    Toronto Ontario Line 3 | Metrolinx

    I so hope I misread that.
  2. K

    Toronto Ontario Line 3 | Metrolinx

    new construction notices Expected duration: Until station is completed in mid-2030 https://assets.metrolinx.com/image/upload/v1776461594/Images/Metrolinx/Ontario%20Line/OL_EGS_-_Construction_Notice_-Sidewalk_Closure-_NFS-4_16_2026_Final.pdf oh boy.
  3. K

    Toronto Ontario Line 3 | Metrolinx

    We’ve hit the 65% mark for piling at the Ontario Line’s second tunnel launch shaft – that’s nearly 800 out of roughly 1,200 total piles, or structural columns, installed.
  4. K

    Toronto Ontario Line 3 | Metrolinx

    Slightly tangential to the start of tunneling. How many TBMs is Metrolinx planning to have? Are they single use or there are plans to keep building? 2 + 2 for Ontario line 2 for Eglinton W 1 at Scarborough subway extension
  5. K

    East Don Trail Project

    This is all based on 2013 Don Valley Master plan. It's amazing how long things take. The plan specifically says (p. 52): " Design Guidelines • Aggressive and ongoing efforts should be made to remove informal trails"...
  6. K

    Toronto Ontario Line 3 | Metrolinx

    My question was inspired by the excited people on Reddit thinking the express trains are coming back to LSE - given the track installations as posted above. From what I see we are far from that. Curious how will Metrolinx use the extra tracks while waiting on other segments. But I should have...
  7. K

    Toronto Ontario Line 3 | Metrolinx

    Watching East Harbour station pictures I wonder. Isn't Broadview ave going under the station? I see it on N 4 rails but S side only shows the orange plastic cover. Is that stretch built as bridge or there will be more rail closures coming?