Concrete pour
The big pour was almost done by the time I took this picture at 6pm. I have to say that this whole operation was turning a lot of heads on Bay st. on Saturday.
I was talking with one of the site workers over the holidays and he told me they still have about 3 meters of digging before the crane comes in. At that time he was saying they should resume digging sometimes in January.