  1. drum118

    Mississauga Toronto | 185 Enfield | ?m | 35s | GWL | Kirkor Architects

    April 25 The tower crane will be gone shortly now the mechanical has shown up for the roof and currently been installed
  2. drum118

    Streetcar Tracks on Adelaide

    April 25 People will be happy to hear the northbound track as well the road where the southbound track is to place has been excavated up to Richmond. This includes the northbound track north of the new section built last year. Don't expect any track base to be pour this week More to follow when...
  3. drum118

    King Street (Streetcar Transit Priority)

    Watch a police officer give tickets to 3 drivers with minute of each other who told the other 2 to wait while he was finishing writing the first one up at Bathurst. It was an unmarked car. Traffic was non-existent but I did see a few drivers run intersections that they were not to do in the...
  4. drum118

    Mississauga Toronto | Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    I see why I couldn't upload my posting last night April 24 I fail to note that there are 5 substations in place from Topflight to Eglinton with a possible 6 that I need to check out to make sure, but are they hock up to the system yet?? There is a 7th by the 403 in the process of being built...
  5. drum118

    Toronto Toronto | Lower Don Lands Redevelopment | ?m | ?s | Waterfront Toronto

    May 2: Villiers Island Density Study In Person Drop In Learn more about the plans for ‘Villiers Island’ and the future opportunities for public input. Register here Port Lands Flood Protection opens 240 hectares of underused post-industrial land for...
  6. drum118

    London Rapid Transit (In-Design)

    City of London, Ontario, receives first shelter for BRT program
  7. drum118

    Mississauga Toronto | Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    Most routes started out on the surface when ridership was low to begin with and there was no need to tunnel in the first place. Soil condition and the age of the buildings pay a big part if tunneling can take place. The city layout also determines if tunneling of a line could take place as well...
  8. drum118

    TTC: Flexity Streetcars Testing & Delivery (Bombardier)

    4614 has enter service on 503 After being off loaded April 2 4615 is now over at Russell for SWIS work 4616 has finish its burn-in and testing
  9. drum118

    Toronto Toronto | Bloor-Yonge Station Capacity Enhancement | ?m | ?s | TTC | AECOM

    It never really worked on the opening days of Line 2 nor will it work today without messing up the Spadina Line service. Lower Bay is used for many things that makes money for TTC which TTC needs badly.
  10. drum118

    General railway discussions

    It was quite common that the crossing was blocked as much as 20 minutes or more from my visits over the years. Sometime, a westbound train had to be made up that was on 2-3 tracks to be one long train. At times, shunting was done on the west end instead of the east end. The mainline is one...
  11. drum118

    Roads: Ambassador & Gordie Howe Bridges

    Looks like 5-6 sections to go to connect both sides together. Beautiful view of the deck and ramp. The area I shot in March that was having hording place to have the deck pour, is now poured.
  12. drum118

    Mississauga Toronto | Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    Several systems that I have seen have sections where batteries are required due to the area and no place to string wires. Nice comes to mind where the plaza area is wire free with the line being wired on both sides of it. It took 10 seconds to convert to either system while stop at the stations...
  13. drum118

    Mississauga Toronto | Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    Does it have overhead, or does it run on battery?? There are tons of examples in Europe where trams run though the city centre with and without overhead like Brampton without any issues
  14. drum118

    GO Transit: Construction Projects (Metrolinx, various)

    Thanks Looks like duct work from the switch to the switchbox still has to be done or for a signal mast that is to be installed where the metal rods(?) are. Otherwise, it looks the same as I saw it a few weeks ago with work completed on the signal boxes.
  15. drum118

    GO Transit: Construction Projects (Metrolinx, various)

    What does the east side look like??
  16. drum118

    Finch West Line 6 LRT

    According to Alstom back in 2008, you add I section to the car, but can the existing platforms handle them?
  17. drum118

    VIA Rail

    One can sit so long in one place that they have to get up and do some walking from my experience in Europe on long train rides. When it comes to sleeping, one can stay in their room for a limited time beside sleeping that they need to be out of the room and amount people. Going to the new...
  18. drum118

    Toronto Toronto | Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    Unless there are some serious issues underground, then 2026 could be an opening day, but 2025 will be the opening day at this time.
  19. drum118

    Finch West Line 6 LRT

    You are saving 2 buses and 7 drivers for each tram. Once the ridership exceeded the 5-minute schedule, you reduce the headway until you need to add a second car that will save more buses and drivers.
  20. drum118

    TTC: Other Items (catch all)

    TTC continues its transition to be zero-emissions before 2040 Apr. 22, 2024 Today is Earth Day, and there is no better way to celebrate than by taking transit. On Earth Day and every day, the TTC is committed to a greener city. As the organization looks ahead to a zero-emissions fleet and...