News   GLOBAL  |  Apr 02, 2020
 8.4K     0 
News   GLOBAL  |  Apr 01, 2020
 39K     0 
News   GLOBAL  |  Apr 01, 2020
 4.7K     0 

  1. kotsy

    Toronto Toronto | The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    @Koops65 renderings are of the 328m height. You can tell by the 2 sections above the 4th mechanical level.
  2. kotsy

    GO Transit: Construction Projects (Metrolinx, various)

    Yes. I digitally add tags to all my photos.
  3. kotsy

    Toronto Toronto | Ontario Line: Exhibition Station | ?m | ?s | Metrolinx | HDR

    With the re-alignment of track 2 complete, a new trench is being built at the foot of Atlantic for hydro to connect to the new station (3 weeks of work). Photo 1 of the ripped up Atlantic Ave, Photo 2 is from the foot of Jefferson looking in towards where the Liberty New Street will be.
  4. kotsy

    Toronto Toronto | Ontario Place | ?m | ?s | Infrastructure ON

    On top of that, they will be building transportation for the last mile between Exhibition Station and Ontario Place. The 509 stops here as well and will be extended to Dufferin loop to bring people in from the 29 bus too
  5. kotsy

    Toronto Toronto | Ontario Line: Exhibition Station | ?m | ?s | Metrolinx | HDR

    A few more from today as they finish up. From Dufferin Bridge, Platform 4 & Strachan bridge (mind the quality from crop).
  6. kotsy

    GO Transit: Construction Projects (Metrolinx, various)

    To add to that: here are some pictures of Exhibition GO track-alignment work in progress.
  7. kotsy

    Toronto Toronto | Ontario Line: Exhibition Station | ?m | ?s | Metrolinx | HDR

    The station was a hive of activity today on the East and West end of the station as they work to move track 2 next to the new track 1. First 3 shots are from the East side of the station, followed by the West end as seen from the Dufferin bridge, then finally a couple shots of the area where...
  8. kotsy

    Toronto Toronto | Ontario Line: Exhibition Station | ?m | ?s | Metrolinx | HDR

    About half of the new track 2 has been laid ahead of this weekend's work. I made an edit of both images with the current track 2 removed to give a sense of the space that is will be left for the new platform that will service track 2 & 3 at the new station.
  9. kotsy

    Toronto Toronto | The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    When you have a partner that speaks your language.
  10. kotsy

    Toronto Toronto | Ontario Place | ?m | ?s | Infrastructure ON

    Already posted this morning along with discussion afterwards
  11. kotsy

    Toronto Toronto | Ontario Line: Exhibition Station | ?m | ?s | Metrolinx | HDR

    Closer look of shifted platform 4 being built out. The station will be closed this weekend to allow for track relocation. https://www.gotransit.com/en/the-future-and-go/construction-notices/lakeshore-west-line-service-adjustment-friday-march-22-through-sunday-march-24
  12. kotsy

    GO Transit: Construction Projects (Metrolinx, various)

    Thanks for that info, Paul!
  13. kotsy

    GO Transit: Construction Projects (Metrolinx, various)

    Installation of two new tracks is progressing past the King/Liberty pedestrian bridge.
  14. kotsy

    Toronto Toronto | Ontario Line: Exhibition Station | ?m | ?s | Metrolinx | HDR

    After months of no progress, work has started back up on the (south) platform 4 extension for shifting to the east to match the (north) platform 1. Also, work is progressing on the track 2 realignment with ballasts now laid for the new track location. And work continues on the pedestrian bridge...
  15. kotsy

    Toronto TD Terrace (160 Front W) | 239.87m | 46s | Cadillac Fairview | AS + GG

    NOPE! Your opinions are completely wrong.

Back
Top