News   GLOBAL  |  Apr 02, 2020
 9.6K     0 
News   GLOBAL  |  Apr 01, 2020
 41K     0 
News   GLOBAL  |  Apr 01, 2020
 5.4K     0 

  1. brianyyz

    Toronto Toronto | 241 Church | 170.7m | 53s | Graywood | Turner Fleischer

    Fenced off. Store is being emptied and the pumps being removed
  2. brianyyz

    Toronto Toronto | 252 Church | 166.1m | 52s | CentreCourt | Arcadis

    No need to take down the signs when the building is going as well
  3. brianyyz

    Toronto Toronto | Eighty One Wellesley | 97.53m | 28s | Aragon Properties | Core Architects

    Really a tale of two buildings here. I walk by it every day up and down Church and rather enjoy its slim and glass filled N/S axis. A friend walks daily across on Wellesley and finds the heavy wall of concrete oppressive over the neighbourhood. A good mural would help. .
  4. brianyyz

    Toronto Toronto | 88 Queen | 167.35m | 52s | St Thomas Dev | Hariri Pontarini

    from Saturday. Crane replacement.
  5. brianyyz

    Toronto Toronto | Elm – Ledbury | 94.18m | 28s | Fitzrovia | Hariri Pontarini

    Waiting for the corner windows with baited breath.
  6. brianyyz

    Toronto Toronto | St Michael's Hospital Emergency Department Redevelopment | ?m | 2s | Unity Health Toronto | NORR

    Interior demolition continues. I see bits of it from my apartment, such as removal of the SMH non-medical waste facility.
  7. brianyyz

    Toronto Toronto | 160 Front West | 239.87m | 46s | Cadillac Fairview | AS + GG

    Walked by with a friend who studied architecture but has moved on in life. he was surprised when I told them the low rise building was part of the same development. best way to cheap out a building—make the cheap parts look like a different complex altogether!
  8. brianyyz

    Toronto Toronto | 252 Church | 166.1m | 52s | CentreCourt | Arcadis

    Pizza Pizza is closed as of yesterday
  9. brianyyz

    Toronto Toronto | 252 Church | 166.1m | 52s | CentreCourt | Arcadis

    Today there were 4 dump trucks of fill to flatten out the lot from where they dug out the small building. I wonder how long the PizzaPizza will stay alive. I know they have been directing orders to this one from their Village location up the street which is closed for renovations.
  10. brianyyz

    398 Church St

    Not sure what this means in the big picture, but there was a soil sample rig in the parking lot in front of Kinton.
  11. brianyyz

    Toronto Toronto | 88 Queen | 167.35m | 52s | St Thomas Dev | Hariri Pontarini

    Already started on the North towers
  12. brianyyz

    Toronto Toronto | St Michael's Hospital Emergency Department Redevelopment | ?m | 2s | Unity Health Toronto | NORR

    Drill rig at the edge of the Shuter Wing, which is next to come down.
  13. brianyyz

    Toronto Toronto | GO Transit: Davenport Diamond Grade Separation | ?m | ?s | Metrolinx

    Not even that in the Netherlands, and things seem to run there fine enough

Back
Top