News   GLOBAL  |  Apr 02, 2020
 8.6K     0 
News   GLOBAL  |  Apr 01, 2020
 39K     0 
News   GLOBAL  |  Apr 01, 2020
 4.8K     0 

  1. P

    Vaughan Toronto | 7Central | 175.4m | 55s | Graywood | Arcadis

    I too am not a purchaser at ICONA but I agree that if a developer commits a breach of contract he should return double deposit back.
  2. P

    Vaughan Toronto | 7Central | 175.4m | 55s | Graywood | Arcadis

    The reputation of the GUPTA'S is well know, they are opportunist, the have no track record, they delay the project and in fact they are flippers It is SAD that their action gives other developers and builder a BAD NAME, the good reputed builders (DANIELS, PEMBERTON, CONCERT etc) do not cancel...
  3. P

    Vaughan Toronto | 7Central | 175.4m | 55s | Graywood | Arcadis

    This is pure greed of the Gupta's The Investors and the Provincial Government need to stand up for the rights of the investors If the purchaser fails to close the builder can forfeit his deposit but if the builder fails to commence and complete the building he could get away by returning the...
  4. P

    Vaughan Toronto | 7Central | 175.4m | 55s | Graywood | Arcadis

    I call upon all purchasers of ICONA to unite, approach the Courts, with a strategy that the Purchasers will jointly develop ICONA without any interference form the developer but under the supervision of a Court appointed RECEIVER, the lawyer of the project and the bank where the purchasers...
  5. P

    LF: Parking Spot

    I have a covered underground parking spot at 21 widmer Toronto intersection king/ john if interested my email id is peterwera@hotmail.com
  6. P

    LF: Parking Spot

  7. P

    Toronto Toronto | Daniels Waterfront - City of the Arts | 156.05m | 45s | Daniels | RAW Design

    Does any one have the Final Staff Report of the City Planning department and the result of the OMB hearing for this entire Daniels Waterfront development
  8. P

    Mayor John Tory's Toronto

    I do not understand how the City of Toronto can issue occupancy permits for units in L Tower which do not even have shower heads and running hot water The City of Toronto and the department which issues occupancy permits must take care to ensure that the basic amenities for human existence in...
  9. P

    L Tower Condos (Cityzen, Castlepoint Realty, Fernbrook Homes) - Real Estate -

    I do not understand how the City of Toronto can issue occupancy permits for units in L Tower which do not even have shower heads and running hot water The City of Toronto and the department which issues occupancy permits must take care to ensure that the basic amenities for human existence in...
  10. P

    Toronto Toronto | U Condominiums | 183.79m | 56s | Pemberton | a—A

    Height for the tower components of the project is that the East Tower is limited to a maximum height of 185 metres (“mâ€) and the West Tower is limited to a maximum height of 155 m
  11. P

    Toronto Toronto | U Condominiums | 183.79m | 56s | Pemberton | a—A

    The OMB dismissed the appeal filed by the City of Toronto and upheld the decision of the COA both towers will have one additional floor each the operative part of the decision is as under [52] It is the conclusion of the Board that the variances meet the four tests prescribed by the Act and...
  12. P

    Toronto Toronto | Aura at College Park | 271.87m | 78s | Canderel | Graziani + Corazza

    The heating and cooling are both centralized which means the entire system is connected to all suite directly above and directly below so that the air is circulated throughout the building
  13. P

    Toronto Toronto | Aura at College Park | 271.87m | 78s | Canderel | Graziani + Corazza

    Strange to allow occupancy during construction It is intriguing that the city permit occupancy of a suite in an under construction building, when the building is not yet topped, poor residents would be paying occupancy fees whilst breathing construction dust through the central HVAC system...
  14. P

    Toronto Toronto | U Condominiums | 183.79m | 56s | Pemberton | a—A

    It has been proposed to increase 3 floors to Phase One building just below the top floor and it has been proposed to increase 1 floor to the Phase Two building

Back
Top