News   GLOBAL  |  Apr 02, 2020
 11K     0 
News   GLOBAL  |  Apr 01, 2020
 43K     0 
News   GLOBAL  |  Apr 01, 2020
 6.7K     0 
  1. SaugeenJunction

    Toronto Toronto | Forêt | 144.95m | 41s | Canderel | BDP Quadrangle

    New inventory really starts to dry up by 2028/2029 based on currents starts… maybe they are gambling on that?
  2. SaugeenJunction

    Toronto Toronto | 1071 King West | 62.2m | 17s | Hullmark | BDP Quadrangle

    From a Pearson-bound UP Express train
  3. SaugeenJunction

    GO Transit: Construction Projects (Metrolinx, various)

    Kitchener Line 4th track at Bloor GO:
  4. SaugeenJunction

    Toronto Toronto | Forêt | 144.95m | 41s | Canderel | BDP Quadrangle

    This morning. Drilling rig now fully assembled and piles of dirt appeared on the site.
  5. SaugeenJunction

    Mississauga Toronto | Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    Work seems to be happening at a much better pace now.
  6. SaugeenJunction

    Toronto Toronto | Forêt | 144.95m | 41s | Canderel | BDP Quadrangle

    Spoke to two of the workers on site today, and “groundbreaking is expected very soon”.
  7. SaugeenJunction

    Dundas West/ Bloor Mobility Hub +interconnected hub network (Metrolinx)

    Love the concrete ties, they look so much better than the wood ones (and are quieter when you’re on the train).
  8. SaugeenJunction

    TTC CLRV Streetcars: Where will they go once they are retired?

    I’d take corporate sponsors even. Run ads on the ad boards for the people who fund their upkeep. Not out of line with real world operation etc.
  9. SaugeenJunction

    Toronto Toronto | Forêt | 144.95m | 41s | Canderel | BDP Quadrangle

    The digger ballet continues, and the rig is now upright. Area in the middle is now cleared out down to dirt level.
  10. SaugeenJunction

    TTC CLRV Streetcars: Where will they go once they are retired?

    Looks like this tender was cancelled on April 10th, 2026 (click "award"). Anyone have more information?
  11. SaugeenJunction

    Toronto Toronto | Eglinton Line 5 Crosstown West Extension | ?m | ?s | Metrolinx

    The views from the train are going to be stunning, especially in the fall. Line 5 really will be a demonstration of all the machinations of LRT: at surface, underground, and elevated.
  12. SaugeenJunction

    Toronto Toronto | Eglinton Line 5 Crosstown West Extension | ?m | ?s | Metrolinx

    Early indications from Metrolinx show the airport extension running up Explorer, rather than Commerce.
  13. SaugeenJunction

    Toronto Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    Wrong thread, but part of the issue is that these stations don't have forced air circulation so its hard to dry up moisture.
  14. SaugeenJunction

    GO Transit: Service thread (including extensions)

    From Facebook. New connection between CPKC and Metrolinx Kitchener Line tracks near Weston Road?
  15. SaugeenJunction

    Toronto Toronto | 91 Raglan | 107.5m | 30s | Camrost-Felcorp | a—A

    Looks like soil testing happening on site today with a mini-drilling rig
  16. SaugeenJunction

    GO Transit Fleet Equipment and other

    Good background. It’s absolutely a weight per axle issue for the St. Mary’s bridge.
  17. SaugeenJunction

    GO Transit Fleet Equipment and other

    The dual axel MP40s were restricted over the St. Mary’s bridge, yes. The Stratford service doesn’t have to contend with this, so my expectation is that weekday rush hour trains will be 12-coaches led by and MP40 locos (as they have to pick up a ton of passengers during the rush). On weekends...
  18. SaugeenJunction

    Kitchener Toronto | Kitchener Central Transit Hub | ?m | 2s | Metrolinx | WZMH

    This is the latest update. The goal is to start construction in October if the court ruling goes well. Lawyers for Kitchener encampment say removing encampment residents is a violation of rights

Back
Top