    Toronto Toronto | Concord Canada House | 231.97m | 74s | Concord Adex | Arcadis

    March 28 - This evening:
  2. A

    Toronto Toronto | The Well | 174.03m | 46s | RioCan | Hariri Pontarini

    March 28 - This evening:
  3. A

    Toronto TD Terrace (160 Front W) | 239.87m | 46s | Cadillac Fairview | AS + GG

    March 28 - Hopefully TD Terrace will be a bit faster about fixing non-working LED sections than Aura's property management and Boards.
  4. A

    Toronto Toronto | Portland Commons | 71.7m | 15s | Carttera | Sweeny &Co

    March 28 Golden Hour: l
  5. A

    Toronto Toronto | The Well | 174.03m | 46s | RioCan | Hariri Pontarini

    March 28: Panorama photo of The Well, and a detail of the west side of the Tridel Signature condominium building, cladding, except for the glazing, is now almost all in place - still needs work on the podium levels.
  6. A

    Toronto Toronto | KING Toronto | 57.6m | 16s | Westbank | Bjarke Ingels Group

    March 28: Keeps getting taller.
  7. A

    GO Transit Fleet Equipment and other

    Siemens lands contract for Toronto-area passenger infrastructure maintenance Agreement with Metrolinx covers passenger network’s Central Region TORONTO — Siemens Mobility has been awarded a contract by Ontario transportation agency Metrolinx to handle track, signal, and right-of-way maintenance...
  8. A

    Toronto Toronto | 88 Bathurst | 68.3m | 17s | Hines | 3XN

    March 28 - From this morning:
  9. A

    Toronto Toronto | 55 Mercer | 155.5m | 47s | CentreCourt | Arcadis

    March 26, 2024 - and a reprise of the comment from a CentreCourt project manager on the 55 Mercer building August 14, 2021. Just as I finished my comment, one of the construction management staff (white hard hat) for 55 Mercer who was walking by turned and said to us 'And we will be finished...
  10. A

    Toronto Toronto | Portland Commons | 71.7m | 15s | Carttera | Sweeny &Co

    March 26 - and much work going on at Portland Commons, so a number of pictures. A general comment - one of the last activities in a construction project is installation of the ground floor level glazing. It is generally not done earlier in the construction process as it would interfere with...
  11. A

    Toronto Toronto | KING Toronto | 57.6m | 16s | Westbank | Bjarke Ingels Group

    March 26: One from the south side.
  12. A

    Toronto Toronto | 422 Wellington West | 14.33m | 2s | Allied | ERA Architects

    March 26: A lot of workers present at the 422 Wellington site earlier this morning - more than I have seen at one time before, with work going on at several locations on the building.
  13. A

    Toronto Toronto | Maverick | 154.53m | 49s | Empire | Arcadis

    March 26, and a Major Milestone - the external construction hoist has gone.
  14. A

    Toronto Toronto | Central Condos | 138.98m | 46s | Concord Adex | DIALOG

    March 26: The Good, The Bad and the Ugly. The Good The Bad - so very slow to finish up the south-east corner of the building. The Ugly - detailing here just does not look good.
  15. A

    Toronto Toronto | QRC West Phase 2 (Queen Richmond Centre West) | 35.96m | 7s | Allied | Sweeny &Co

    March 26 - Slowly getting closer to being done.
  16. A

    Toronto Toronto | Ontario Line: Queen-Spadina Station | ?m | 1s | Metrolinx | HDR

    Tuesday, March 25: Shoring machine on the north side of Queen Street site. That makes a total of three shoring machines now on site for the Ontario Line Queen and Bathurst station, in addition to the two shoring machines and King and Bathurst - a total of five Ontario Line shoring machines in...
  17. A

    Toronto Toronto | Ontario Line: King-Bathurst Station | ?m | ?s | Metrolinx | HDR

    Tuesday, March 26. More progress. The second shoring machine has arrived, this time to the north side of King Street. Setup of the shoring machine on the south side of King Street is continuing. Photos from the south side of King Street site show an interesting detail - a trench has been dug...