News   GLOBAL  |  Apr 02, 2020
 11K     0 
News   GLOBAL  |  Apr 01, 2020
 43K     0 
News   GLOBAL  |  Apr 01, 2020
 6.7K     0 
  1. Leo_Chan

    Toronto Ontario Line 3 | Metrolinx

    Do you think they're not being serious enough with the editing?
  2. Leo_Chan

    Waterfront Transit Reset Phase 1 Study

    As stated by others time and time before, there needs to be unconditional funding from the Provincial and Federal governments for transit that can be used for anything the City wants. Toronto City Council can debate how to spend the funding as much as they can, but there needs to be an...
  3. Leo_Chan

    Toronto Ontario Line 3 | Metrolinx

    No seagull though.
  4. Leo_Chan

    TTC: Scarborough Busway Construction (portion of the former Scarborough RT route)

    Three Highland Creek indefinitely single track bridges have entered the room. Not to mention there's simply no room in the right of way, especially at existing GO stations. I feel it would be much better spent to funnel buses into Stouffville GO 10 minutes or better rather than a bus trunk.
  5. Leo_Chan

    Waterfront Transit Reset Phase 1 Study

    Watch the Yonge Street portal and wye only start construction after the entire surface portion is complete and no service for years on near completed infrastructure. 🤣
  6. Leo_Chan

    Waterfront Transit Reset Phase 1 Study

    Do you think renaming from Waterfront East LRT (in most places) to Waterfront East Transit was a condition for Provincial funding?
  7. Leo_Chan

    Waterfront Transit Reset Phase 1 Study

    Does this condition have a chance of the City reducing the scope of the project by trimming the Union Station loop expansion? Or does the cost already consider the potential unknown challenges in the area?
  8. Leo_Chan

    Square One Drive and City Centre Drive Extension

    Does the median make it impossible to add a left turn from Hurontario St southbound to Square One Drive east extension ?
  9. Leo_Chan

    Finch West Line 6 LRT

    The handlebar blocking the screen was my first thought once stepping on the trains.
  10. Leo_Chan

    Toronto Ontario Line 3 | Metrolinx

    The main entrance on Danforth Ave and secondary entrance on what appears to be a pedestrianized Lipton Ave seems like just one building. How exactly is it defined as a secondary entrance if both doors appear to use the same vertical circulation and are just two sides of a larger than normal...
  11. Leo_Chan

    Finch West Line 6 LRT

    Well it isn't the first time the TTC didn't look to other Ontario examples for help. This is referring to the lack of looking to Kitchener ION LRT for operational advice by staff at the first post opening board meeting. It is surprising that actual physical infrastructure was missing from the...
  12. Leo_Chan

    TTC Cartography, Signage, and Wayfinding

    I don't believe the TTC has any unique designs for the SSE, they are simply reusing marketing materials provided by Metrolinx.
  13. Leo_Chan

    Ontario Line Extension West of Ontario Place (Speculation)

    This is the MCC Hurontario LRT loop but for Line 3. 🤣
  14. Leo_Chan

    Toronto Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    They need to get these maps digitally available online on the TTC website for easier planning.
  15. Leo_Chan

    Toronto Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    Is the hallway referring to at the bus terminal level or below? I recall seeing pictures posted of the elevator below. Additionally, will the Ontario Line platform be right above the station and aligns with this elevator so it will be replaced and extended, or will there be a different elevator?
  16. Leo_Chan

    Toronto Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    The Don Valley Station bus terminal elevator being out of service for the Ontario Line confuses me. Are they being extremely precautions to prevent riders from being in any danger at all? I can understand not opening the bus platforms and street entrance, but why would the inside of the bus...
  17. Leo_Chan

    Toronto Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    If Don Valley Station does get service and they have the will to close the Leslie intersection, then potentially it can get infinite signal priority, where left turns from eastbound and southbound can be closed off. 🤣
  18. Leo_Chan

    Sheppard Line 4 Subway Extension (Proposed)

    Meaning instead of trains going from the wye at Yonge to Sheppard, they would reach the line from Wilson Yard directly?
  19. Leo_Chan

    Eglinton East LRT | Metrolinx

    Replacing one parallel transfer with another one, but this time with half operating the speeds. :p

Back
Top