  1. C

    Toronto Toronto | Sixty Colborne Condos | 82.29m | 25s | Freed | a—A

    Perhaps they should but I just build them and have zero say in the matter.
  2. C

    Toronto Toronto | Sixty Colborne Condos | 82.29m | 25s | Freed | a—A

    It’s expensive and very time consuming. Took us over 6 months to donjust that.
  3. C

    Toronto Toronto | Sixty Colborne Condos | 82.29m | 25s | Freed | a—A

    Good afternoon everyone. I would like to thank everyone for voting 60 Colborne the number one building in the 20-29 story category of 2018. It was our pleasure to build it. I would like to thank all the locals for putting up with us for the last 3 + years and apologize for any inconvenience...
  4. C

    Toronto Toronto | Sixty Colborne Condos | 82.29m | 25s | Freed | a—A

    2 roll up doors. 1) first is move in room and garbage room (garbage room is through the move in room in its own room don’t worry) 2) secod roll up door (the one further west) is parking door. P1 to P2 is public parking and the price is $12. P3-P5 is residential numbered like all with its own...
  5. C

    Toronto Toronto | Sixty Colborne Condos | 82.29m | 25s | Freed | a—A

    The common mistake is that people always assume an artists rendering is the final result. The rendering everyone sees is 2 years before real working drawings are created. It’s an idea a concept kinda like a concept car at an auto show. How often have you seen a concept car on the road exactly...
  6. C

    Toronto Toronto | Sixty Colborne Condos | 82.29m | 25s | Freed | a—A

    From what I heard that building cost $2000.00-$4000.00 a sqf. ( but you would have to verify it) That Glass was imported from Germany and each section was one piece of glass bent. There is no way a building that expense would sell here in Toronto.
  7. C

    Toronto Toronto | Sixty Colborne Condos | 82.29m | 25s | Freed | a—A

    In case you guys wanted to see the mock ups how the glass design originally looked.
  8. C

    Toronto Toronto | Sixty Colborne Condos | 82.29m | 25s | Freed | a—A

    Yes the cladding is metal the design was changed from glass to metal. There was durability concerns and how the glass will look after time. Also the glass wouldn’t have looked as good as it was made from multiple pieces. I also hear the paint is automotive grade. Installation will take time do.
  9. C

    Toronto Toronto | Sixty Colborne Condos | 82.29m | 25s | Freed | a—A

    It has been fun reading all these comments over the last 3 years. I don’t want you guys fighting so I will fill you guys in. The orange appliqué is coming. We erected the overhead protection for that reason. The outriggers are no longer being utilized as we had to make changes to the appliqué...
  10. C

    Toronto Toronto | Sixty Colborne Condos | 82.29m | 25s | Freed | a—A

    Crane came down today... one step closer