News   GLOBAL  |  Apr 02, 2020
 9.1K     0 
News   GLOBAL  |  Apr 01, 2020
 40K     0 
News   GLOBAL  |  Apr 01, 2020
 5.3K     0 

  1. F

    Mississauga Toronto | Exchange District Condos | 232m | 72s | Camrost-Felcorp | Arcadis

    I think youre right, its EX1 and EXS that are well above ground. EX2 is just above ground and EX3 is a hole.
  2. F

    Richmond Hill Toronto | Y9825 | ?m | 22s | Metroview | Wallman Architects

    Crane on site...now the real fun begins
  3. F

    Mississauga Toronto | Exchange District Condos | 232m | 72s | Camrost-Felcorp | Arcadis

    Yes thats EX1, the 2nd building way above ground looks like EXS which shares podium with EX1 (pink top).
  4. F

    Mississauga Toronto | Exchange District Condos | 232m | 72s | Camrost-Felcorp | Arcadis

    Im a bit confused, please clarify with pic below which building is which.(T1 is EX1, T2 is EX2?)
  5. F

    Mississauga Toronto | Exchange District Condos | 232m | 72s | Camrost-Felcorp | Arcadis

    Thanks, EX2 is at least 2 yrs out by the looks of things.
  6. F

    Richmond Hill Toronto | Y9825 | ?m | 22s | Metroview | Wallman Architects

    Seems like Metroview wants to finish the 8888 project before starting work on Y9825.
  7. F

    Toronto Toronto | Quay House | 73.15m | 21s | Empire | Kirkor

    Nice, almost at grade
  8. F

    Mississauga Toronto | Exchange District Condos | 232m | 72s | Camrost-Felcorp | Arcadis

    Yes youre right EX2 and EX3 are to the left, EX2 is in the back and looks underway with the crane, EX3 is in the front and is just doing grading
  9. F

    Mississauga Toronto | Exchange District Condos | 232m | 72s | Camrost-Felcorp | Arcadis

    Any activity yet on the other side for EX2 and EX3?
  10. F

    Mississauga Toronto | Exchange District Condos | 232m | 72s | Camrost-Felcorp | Arcadis

    Exactly...occupancy for any of these buildings may start 2025.

Back
Top