DougB
Senior Member
The towers will fill in a skyline gap between dt and East Village. If tall enough (~150m), they would balance the sharp drop-off east of the Bow
Funny I was at the library on Thursday and saw the crane base. I was wondering why it was there. Thought maybe they hadn’t finished taking it down.There is a base crane sitting on top of the roof on the east side that I don't think was there before. I had heard a rumour that that the crane was going up imminently and that the first tower was going ahead. Hopefully that is true.
Typically cranes aren't installed inside the footprint of a tower except for very tall buildings like 'The One' in Toronto currently. This is a fair distance from the tower footprint for construction to occur.
I wonder if the crane base is actually mounted? Maybe it's waiting to be mounted in its final spot.
That must be it. Probably waiting on the mobile crane to unload the other crane sections when delivered and move them into place. A crane over that double height section with just those angled columns under it seems too unusual.