I think the child in the render may be confused about where she is.
Totally agree. Everything else about the location and proposal is fine to me.What moron in mobility engineering required two curb cuts onto a Main Street when the lane configuration could've provided the neccessary vehicular access? Or is this first submission on DP (pre-DTR1) that the applicant submitted?
View attachment 531370
Red entrance is the dead end lane that could be maintained but the blue side by side entrances would be entirely redundant with a hammerhead design somewhere on the lane:
View attachment 531377
Centrals Taps is a nice add, and the materials are nice, but no way this should move forward with this many curb cuts along a Main Street. The planners who are working on Main Streets policies should fight mobility on access for this block or they will be compromising the main street improvements happening.
The original sin was that there was no alley that cuts through the whole block for whatever reason (go back a few pages in this thread to see previous discussions).Wouldn't the issue with the driveway be that the existing driveway is on the property of the adjacent building; I'm assuming the adjacent building's owners wouldn't love people and garbage trucks accessing Central's property using their driveway which they pay to maintain.
Oddly, this section of 33rd really suffers from this. Even on the northside of the road, where there is an alley, there is no street frontage of much else but parking lots.The original sin was that there was no alley that cuts through the whole block for whatever reason (go back a few pages in this thread to see previous discussions).
Rather than do anything about that, what we have done instead is allow everyone to have their own direct accesses across the main street sidewalk. We can't have a garbage truck reverse down the existing alley stub or do a three-point turn because of reasons (even though this happens all the time everywhere), we also can't just have the property serviced by a smaller garbage truck for some reason, we also can't load and unload from the street like most cities in the world for some reason, and we also can't have two neighbouring parcels share a single, existing ramp access for further reasons. The result is a compromised main street that will underperform and be unattractive forever - all to create a block with duplicative, redundant garbage truck circulations.
Many ways to solve this problem that doesn't compromise the main street and the street frontage. We just can't seem to do them yet - hopefully further design iterations will change that.
In this case the benefits are also super clear too - more development potential, better walking and pedestrian environment on a key main street with huge public and private investment occurring. It should be in everyone's best interest to solve this one.
I am sure they can - but a bigger question might be why we need this circulation at all. A right-of-way is already set aside to access the parcel from the alley.Could the city use eminent domain to build the rest of the alley? It looks like the ROW is just parking lots and a retaining wall/fence. Won't be cheap, but won't be too costly, either, and no buildings would be lost.
Wouldn't even need the trucks to reverse if they created a turning head on the SW corner of the subject parcel that could accommodate an SU-9 truck's turning radius and submit a swept path analysis to show it works, i don't see why that wouldn't be acceptable design to accommodate truck loading without the need for another curb cut onto 33rd.I am sure they can - but a bigger question might be why we need this circulation at all. A right-of-way is already set aside to access the parcel from the alley.
View attachment 531699
It would cost zero dollars if the city just had two rules:
1. Don't allow curb cuts over Main Street sidewalks.
2. Allow trucks to reverse.
I am pretty sure #2 isn't a thing, so all they got to do is actively enforce #1? It's just a bar, it's not an regional amazon distribution hub with a hundred semis an hour. Bars all over the planet exist without through-lane lane access.
The problem we are trying to solve here by keeping truck circulation is imaginary and is detrimental to the entire point of the development.