MichaelS

Senior Member
Member Bio
Joined
Jul 6, 2016
Messages
3,340
Reaction score
28,067
A new DP in Bridgeland, on the Edmonton Trail couplet northbound portion:
1715955701067.png


1715955721073.png
 
Ground floor could use some work here - the ridiculously large road setback on Edmonton Trail isn't helping either. The rendering and the design both overestimate how steep the slope is, it's almost like they couldn't imagine designing anything on a slope so they just plopped a design for a perfectly flat site down and called it a day.

Agree about the materials - less is more!
 
I think the grade as shown is pretty accurate. They could however attempt to modify it instead of just perching on top of the existing area well above the sidewalk. Not sure where the property line falls however.
 
It’l be a nice addition to that area. It’s too bad that section of Edmonton trail has the ambience of a freeway.
 

Back
Top