General rating of the project

  • Great

    Votes: 25 25.8%
  • Very Good

    Votes: 53 54.6%
  • Good

    Votes: 14 14.4%
  • So So

    Votes: 4 4.1%
  • Not Very Good

    Votes: 0 0.0%
  • Terrible

    Votes: 1 1.0%

  • Total voters
    97
I believe excavation has begun. Yayyy for tower starts!
A8FF35E3-5E9C-48A5-AF45-09B4EA8B976F.jpeg
 

Attachments

  • A8FF35E3-5E9C-48A5-AF45-09B4EA8B976F.jpeg
    A8FF35E3-5E9C-48A5-AF45-09B4EA8B976F.jpeg
    171.8 KB · Views: 905
Do they even have a BP yet?
They do indeed :)

I believe excavation has begun. Yayyy for tower starts!
I'm not sure if it has yet...I believe they were digging out some sort of basement. My guess would be about 6 weeks or so, as the drilling rigs haven't been on site yet, but I wouldn't be surprised if they arrived soon.
 
The boulders that you see in the picture were brought in to stabalize the walls, they have since brought in some fill material to reduce the slope and raise the floor of the pit.
 
The boulders that you see in the picture were brought in to stabalize the walls, they have since brought in some fill material to reduce the slope and raise the floor of the pit.
For sure. They would have to refill the pit and stabilise the area before the drilling rigs get there.
 
Will grab a pic tomorrow.
 
What are the rules for developments when they just have a DP? Can they start excavation without the BP? Is there a special permit for it?

Edit: I see a comment above says they do have a BP. So ignore my post
 
Last edited:
Drilling has definitely started!

February 26, 2018

4DEA41DF-E359-4343-9355-F788F9870D50.jpeg


4CCBC38E-8CDE-4042-BBB4-546BC66C66BA.jpeg
 

Attachments

  • 4DEA41DF-E359-4343-9355-F788F9870D50.jpeg
    4DEA41DF-E359-4343-9355-F788F9870D50.jpeg
    618.6 KB · Views: 727
  • 4CCBC38E-8CDE-4042-BBB4-546BC66C66BA.jpeg
    4CCBC38E-8CDE-4042-BBB4-546BC66C66BA.jpeg
    581.6 KB · Views: 687
The construction schedule calls for completion in Q2 of 2020. Sounds ambitious but Ellis Don who is the G.C. for this, built Portfolio on 13 Ave in 18 months or so. Hines Block is a much larger project of course.
 
Since there's been no sight of a DP or BP for the northern phase, it for sure will not be built by Q2 2020 :p
 
Nice to see a drilling rig on site. I figured this one was going ahead, but this confirms it.
 

Back
Top