Is there a timeline for 6 St?11th Ave will be torn up for the Green line construction and 6th Street will be extended for the new tunnel under the CPKC tracks
Is there a timeline for 6 St?11th Ave will be torn up for the Green line construction and 6th Street will be extended for the new tunnel under the CPKC tracks
Much of Eau Claire was also raised. If you look at some of the parking lots, they are below street level as they were not raised.They raised grade in large portions of the east village 1-2m to get above the flood plain. Look at current and past street views in the NE portion of the area, you can see it happening as part of the infrastructure and paving that was undertaken.
I was trying to remember which lot was a couple feet below street level, was thinking it was in EV, but this is the one I was thinking about! This building is a good example of where the street levels used to be in the Eau Claire area. Joe Phillips BldgMuch or Eau Claire was also raised. If you look at some of the parking lots, they are below street levels as they were not raised.
The retaining wall on the other side of these bushes shows how much grade was raised when Livingston Place went upI was trying to remember which lot was a couple feet below street level, was thinking it was in EV, but this is the one I was thinking about! This building is a good example of where the street levels used to be in the Eau Claire area. Joe Phillips Bldg
Patently hilarious. Imagine if we had taken $5k of that to cut it down (which is, ultimately, what happened), and used the other $1,995,000 on landscape enhancements for the entry plaza and around the EC.I heard over the weekend that the CIty spent $2m determining what to do with that tree. They had to form a special committee to decide it's fate. JFC
Sometimes people get so focused on the little things they lose track of the big picture. $2 Million could have bought them a couple hundred new trees and the costs of watering and maintaining them for a few years.I heard over the weekend that the CIty spent $2m determining what to do with that tree. They had to form a special committee to decide it's fate. JFC
Ooh, do they have any other tidbits?Patently hilarious. Imagine if we had taken $5k of that to cut it down (which is, ultimately, what happened), and used the other $1,995,000 on landscape enhancements for the entry plaza and around the EC.
Anyway....can confirm the press and club ?bridges (ala, MSG and LCA) are still part of the design. Have a friend working on the engineering components of that.
Pretty standard city processes, but the $ amount is very likely a blend of hyperbole with back casting a future estimate on how to move such a thing.I heard over the weekend that the CIty spent $2m determining what to do with that tree. They had to form a special committee to decide it's fate. JFC
not really, did acknowledge what's already been publicized is a gamechanger for the bowl design...mid-level club concourse, and main concourse at top of lower bowl. Exterior will look different, aside from obvious community arena addition.Ooh, do they have any other tidbits?
And yet it would still be an upgrade over watching highlights on a 90s big screen tv, like the poors in the Saddledome currently get.I'd also like a clean, square scoreboard look like toronto/vancouver/edmonton....unlike those rectangular things which give a middle finger to anyone on the ends.