By my notes, demolition of the old Chinese food restaurant was completed in August 2018. So probably looking at 55 months to complete a project that was initially scheduled to be 18 months. I'm sure they're value engineering pretty much everything they can at this point.
 
F8369DD9-F9FE-47F9-A862-E4CEDE3869CD.jpeg
2B5CFC4B-C99F-4B01-9BC1-B30160F58FDF.jpeg
 

Back
Top