General Rating for this project

  • 1 Great

    Votes: 129 86.6%
  • 2 Very Good

    Votes: 11 7.4%
  • 3 Good

    Votes: 3 2.0%
  • 4 So So

    Votes: 4 2.7%
  • 5 Not Very Good

    Votes: 0 0.0%
  • 6 Terrible

    Votes: 2 1.3%

  • Total voters
    149
543_0000.jpg
 

Attachments

  • 543_0000.jpg
    543_0000.jpg
    1.6 MB · Views: 934
The core has moved quickly, probably because of the nice weather. It won't be long before it's above grade.
 
I wasn't able to snap a pic at the time but I noticed yesterday that the concrete pump is well above grade now, so the core section may actually be at ground level already. I'll run around and do an update sometime this week.
 
Man do I hope that core goes right past grade and keeps shooting upwards. The rumours are too much for me.
 
Man do I hope that core goes right past grade and keeps shooting upwards. The rumours are too much for me.

I thought that the rumours were that it would be capped after the office component, not at grade.
 

Back
Top