General Rating for this project

  • 1 Great

    Votes: 132 86.8%
  • 2 Very Good

    Votes: 11 7.2%
  • 3 Good

    Votes: 3 2.0%
  • 4 So So

    Votes: 4 2.6%
  • 5 Not Very Good

    Votes: 0 0.0%
  • 6 Terrible

    Votes: 2 1.3%

  • Total voters
    152
I find that the colours selected for each of the two buildings are very appropriate for their specific locations. I've watched Vancouver house go up during monthly trips to Vancouver over the last 18 months. I love the way the balconies protrude from the building face. That combined with the twist and the "upside down" massing make it a really interesting project to see in person.
 
Hi,
I will B most interested when the 60th Floor is completed.Guess it means the last of the roof top will B completed as a Section of sorts. Not sure of completion date
but I think its close to a Yr behind Schedule. Guess it gives us something to b proud of later.
Tnx,
Operater.
 
DSC_4616.JPG
DSC_4616a.jpg
DSC_4613.JPG
DSC_4614.JPG
 

Attachments

  • DSC_4616.JPG
    DSC_4616.JPG
    182.2 KB · Views: 484
  • DSC_4616a.jpg
    DSC_4616a.jpg
    141.9 KB · Views: 452
  • DSC_4613.JPG
    DSC_4613.JPG
    159.3 KB · Views: 526
  • DSC_4614.JPG
    DSC_4614.JPG
    205.7 KB · Views: 466
What do you mean it's not even close?

It's like 1 or 2 floors away from being topped out.
 
It's a comparative term to other buildings; not how many floors it is away from completion. I think you misinterpreted what I wrote.

I mean yeah, no other buildings are even close to as cool as Telus Sky. It's easily the nicest skyscraper in the country, at least the nicest over 200 meters. The only one that comes close in that regard is Scotia Plaza.
 
Hi,
This Project maybe behind schedule but I figure it will still B Worth While in a few months when its Mostly Closed In.
Interesting to say the Least.

Tnx,
Oerater.
 

Back
Top