89504


89505
 
I've got a question. Why is the north side of the excavation not at the same depth as the south side?
 
I've got a question. Why is the north side of the excavation not at the same depth as the south side?
Levelmind would probably know the answer to that, but I've noticed a few underground parkades that are like that...where they stagger each sides.
 
The forecast is favorable for the next 7 days, good time to get as much concrete work done as possible.
 