Another update from today. More progress on the District Townhomes:
1707688128977.png


The Quarters is now up above grade (sorry, photo doesn't capture it as well as I thought):
1707688193795.png


Mondrian is now reaching its final height for the west building I think, and windows going in:
1707688240325.png

1707688265691.png


The grocery store site is being graded, and looks like shallow utility installation is being prepped. I am going to consider this one under construction now:
1707688327361.png


Plaza's west building is now also clearly above grade:
1707688359495.png


Trico's West83rd Townhomes are also moving along pretty well:
1707688393309.png
 
A nice sunny afternoon for a construction photo update. Not construction related, but people have moved into Parkside, multiple patios had furniture out, even saw a few people sitting on them enjoying the sun:

Not quite under construction yet, but a pile driver is on site for Adelaide, so likely starting up very soon:
1710714571689.png


The Quarters is up above the main floor now:
1710714615284.png


The sales centre is now open in its new location, in the middle of the neighbourhood. Should give a much better idea to prospective residents of what the area will look like:
1710714668411.png


District Townhomes are really rising/coming together:
1710714698293.png

1710714720137.png

1710714743414.png


West 83rd Townhomes (Trico) are also coming along. No indication if anyone has moved into the first building yet, but I didn't look that close:
1710714785799.png

1710714804013.png


A couple of basements have been dug/poured for the West Single Family Homes (Trico), so they are now under construction:
1710714857721.png


Mondrian's West Building is fully topped out and enclosed. There is even the ground floor retail glass installed. The East building is up to level 3:
1710714937856.png

1710714956649.png


Plaza's West Building has columns up for the 2nd floor (or maybe 3rd, as the front half is double height retail while the back of the building is 2 storey townhomes), while the East building has the columns for the first floor poured:
1710715031192.png

1710715056369.png


And the grocery store is really coming along now too:
1710715099630.png
 
Went for a walk at lunch before the snow falls. I was away on a holiday over the school spring break, and so this was the first time I had walked through the area since probably my last photo update a month ago. Quite a bit of progress (I am amazed how quickly they can frame up townhomes and single family houses):

Big progress at District Townhomes. Nearly every building is either full height or well on its way. When you scroll up thread, you can see the air photos that Truman posted just a month ago, and most of these buidlings were still just a slab foundation:
1713208657258.png

1713208680634.png

1713208705276.png


The Quarters has its first 2 levels up, and working on the 3rd:
1713208752523.png


Drilling for Adelaide has started:
1713208776852.png


Both buildings of Mondrian are full height, no cladding yet (apart from ground floor glazing):
1713208842163.png


Excavation has started for Oak & Olive, so while the piles were driven last summer/fall, it is not sitting for long:
1713208893770.png


The foundation for the grocery store is coming along. I bet this will be open by the end of the year:
1713208937494.png


Plaza is up on its second level (sorry about the finger sneaking in):
1713208977795.png


Trico's West83rd is coming along:
1713209014724.png

1713209036643.png


And a couple of single family homes of Trico's are already framed up:
1713209079912.png

Bonus shot of the park space that will be in the SW corner of the community:
1713209120850.png
 
Some construction updates:
Radio Block has started construction:
1717963594724.png


The utility building in Radio Park is also well underway:
1717963635284.png


The Quarters:
1717963669702.png


Adelaide:
1717963700418.png


District Townhomes:
1717963755882.png


Brick on the Mondrian is going up, not as white as I thought:
1717963799291.png

1717963831949.png


Plaza:
1717963856465.png
 
They are tearing out the median on 85 St most of the way from Bow Tr to OBCR. I can't find any info on any city maps about what its for. Doesn't seem to be anything to do with mobility as there are still some crappy ped ramp designs that don't appear to be part of it. Anyone know?
 
Passed by this last week. They have finally removed the fencing around the majority of the district and you can walk right up to the main park now.

Plaza (Amenity balcony supports in the foreground)
image.jpg


District Townhomes
image (3).jpg


Truman Headquarters + Radio Block Foundations
image (2).jpg

image (1).jpg


Broadcast Avenue streetwall is starting to fill in. (Namesake 250m CBC tower in the background)
image (4).jpg

image (6).jpg


image (5).jpg



Radio Park

image (7).jpg
 
Last edited:
The mid rises are great. The townhouses don't. District ellicits thoughts of a public storage facility but, the modern vernacular is secondary. I wish they had gone with blocks on real streets even if it meant fewer blocks could be built. These master plans with blocks arranged around private driveways presents as post war suburbia than front porch walkable neighbourhood.
 