34620841243_d28a72a7c7_h.jpg

Finished with the Friction piles, almost done with the sheet piles

can you see me now ? High Visibility gear mandatory.
35264258092_25021cb2a1_h.jpg


Hangers
35430681695_6e1f74dbf1_h.jpg


No. 60
35264258802_202694fcd4_h.jpg


How you attach friction piles to the mat. (rebar is welded on)
35391170276_97dfeef85d_h.jpg

The wire is to keep the rebar at least on aggregate size away from the "surface" [the size of the rocks used in the concrete]


Preparing for the mat
34588646194_9ff22b4240_h.jpg
 
July 7
can you spot the managers ?
34947697744_43d58aca45_h.jpg


34947694674_c6bf5692e5_h.jpg


A balance beam ? (used to extend the reach of a crane)
34947698884_cf866b09a6_h.jpg


Similar looking device used at 300 N LaSalle (2008)
35656036631_794fe0bf2c_h.jpg
 
Oct 30

24218374808_30818dde54_h.jpg


24218369038_739111aadf_h.jpg


These hold up the forms for the floor, once the floor sets they are cranked down, the form pried off, and they are then re-used a few levels up.
26294919159_03b72e2995_m.jpg
24218364628_90b4767422_m.jpg
26294920289_b0cb02cc6c_m.jpg
 