Aug 25
36562380300_5e32f74e9f_h.jpg


36124065794_fbb6c6e99f_h.jpg



Aug 29
36124065194_97c91b4f92_h.jpg


36562379420_6f80dfbac6_h.jpg
 
Sept 26

37457642901_a9812b74e0_h.jpg


Sept 28

37200419210_3a12623e4f_k.jpg


Transfer floor - a foundation in the sky.
37457642211_1f9fc80675_h.jpg


visible from the lobby of 321 N Clark
37200418860_b5c5acc0fa_h.jpg
 
Oct 18

37090699934_9cefede3fc_h.jpg


37752267486_d7126a269e_b.jpg
37090709734_5635dfbef0_b.jpg


37542277250_8a33313b20_h.jpg


Bronzed window frames.
37090713844_e63cafdcd5_h.jpg


37542274420_df8623dcf4_h.jpg


Real stone on the lower levels ?
37090718104_52b7be8b9c_b.jpg


Concrete - ground cloth - and Styrofoam. Held down in the wind by sandbags.
37090720754_11e0d1e3ba_h.jpg


37090702414_673ccc47e6_h.jpg
 
Nov 10

From the Harlem sta. cranes on the left
37757049954_e38f62ce92_h.jpg


Nov 3

37757050954_6a7ed4ac11_b.jpg


37757050524_38d77102e4_h.jpg


Nov 1

From the Ridgeland sta. 465 Park's crane shows up as well
38416025676_a8a46531d2_h.jpg
 

Back
Top