Oak Park Station - Oak Park, Illinios (part of Chicago)

Oak Park Station

5 & 14 Stories

268 Apartments

Parking for 500 Vehicles

34,000 SF Retail

457,700 SF Total

Designed to seek LEED Silver Certification

A redevelopment located in historic downtown Oak Park, Oak Park Station is a mixed-use project designed with retail space as well as luxury apartment homes. Located in close proximity to the Metra train station, the site will provide convenient transportation for residents working in downtown Chicago.

The development consists of two structures; a North building and a South building, which successfully conceals the majority of the secure parking. Linking the two buildings is a glass and steel bridge, acting as a gateway onto Westgate Street, a quaint retail shopping district.

The buildings will be constructed of pre-cast concrete, metal panel and glass–a modern approach that compliments the historical nature of the surrounding site. Multiple environmentally sensitive elements such as green roof gardens for residents, native plants, stormwater collection and efficient building systems are employed on the site.

http://www.fitzgeraldassociates.net/projects/mixed--use/oak-park-station.htm

Westgate Street/Lake Street Development Project


A mixed-use residential, retail and parking project has been proposed for the Village-owned site where a surface parking lot now sits between Lake Street and North Boulevard just east of Harlem Avenue.

Plans call for constructing a five-story building fronting Lake Street and a 20-story building facing North Boulevard. The two buildings would be connected by a pedestrian bridge over Westgate Street. Combined, the buildings would include about 26,000 square feet of new retail space, 271 luxury apartments and a five-level parking garage with 400-plus parking spaces.

The project is a partnership of Clark Street Development LLC and Lennar Multifamily Communities.
 
Tishman on site and scoping it out.
P1370574.JPG


Turn around created to handle the construction traffic and deliveries to the existing shops.
20151109W.jpg

P1360026.JPG
 
3/8
Looking South
IMG_3204.CR2.jpg


3/14
The last 3 peaked roofs are the facades being saved.
P1400942.JPG


P1400948.JPG


P1400963.JPG


3/15
P1410037.JPG


Looking N from the CTA sta.
P1410043.JPG
 
P1410958.JPG


4/03
IMG_4502.jpg


4/11
P1420032.JPG


4/14
P1420194.JPG


old limestone block foundation - next to new footing.
P1420203.JPG


4/22
P1420829.JPG


more of the townhose footings
P1420839.JPG


4/27
Belling bits for the high-rise section
P1430102.JPG


Another view from the Dentist's office - these windows will be bricked up.
P1430108.JPG


5/11
P1430786.JPG


P1430793.JPG


P1430796.JPG


P1430802.JPG
 
5/25
IMG_7619.CR2.jpg


An old stepped footing dug out of the pit for the high rise elevator ( same as belling, but done by hand).
P1440125.JPG


Elevator shaft for the low-rise section.
P1440143.JPG


From the dentist office next door ( Reisinger ) - these windows will need to be bricked up since the replacements (to code) would be prohibitively expensive.
IMG_7623.CR2.jpg



IMG_7634.jpg


5/27
Steel goes up fast.
P1440208.JPG


6/1
A new crane on the skyline
P1440372.JPG
 
June 22
Prepping the first floor on a rainy day, this is the bottom of the slab that the townhomes will be built on.
28849339010_44f22d8537_b.jpg


July 06
The highrise section starts rising.
28514509424_290924b032_c.jpg


July 20
townhomes starting on 2 of 4.
29031143652_9d034be551_b.jpg


29031147472_2adba1e20e_h.jpg


Aug 01
High rise spreading out an impressive parking podium
28849351980_03307d0517_b.jpg


28514515724_c212af0eb1_b.jpg


Safety windows.
28514507344_7056f012ed_b.jpg


Aug 17
28514506194_b4b27baba1_b.jpg

With Vantage Oak Park in the background.

29136302175_266fef4d20_c.jpg
 
Aug 23
29590388972_a9f2819b50_h.jpg


29590389172_8631217eb7_h.jpg


Sept 12
29075319374_111c8750ae_h.jpg


29666217456_414ae740aa_h.jpg

with Vantage OP in the background

Sept 13
(From Vantage OP)
29590389652_a3d2fd1e51_h.jpg


29075320014_77546a0a96_h.jpg


From the Harlem CTA stop
29590390022_04068ec604_h.jpg
 
Located at the Harlem station ;-)

Jan 9 - Glass
32415384162_bdb18f6429_b.jpg


a stressfull floor to live on
32527289836_921b035d64_b.jpg

(the dots on the edge of the slab are from post tension cables)

A protected walk to .... your car
31756310383_bbfb2095a7_b.jpg


Jan 13
The view from the last big surface lot
32445631411_cf9327bcd5_b.jpg


Jan 26
Forms down
32568275255_6962a2f777_b.jpg


31756302053_1414790c22_b.jpg
 