March 28

39358736810_1e3442110f_h.jpg


40456558774_0cc12253a0_h.jpg


Removing the whaler now that the floor has set.
27295417698_0c7dc42d63_h.jpg


26296714077_4b9caa5429_h.jpg


Well grounded.
27295410908_4b4c72a3d6_h.jpg
 
April 20

40912046284_08797910a0_h.jpg


41582439392_24c51a07e6_h.jpg


41582434752_4e01700c95_h.jpg


Premade holes - putting in holes after the floor is poured is a lot of work.
Not sure what the boxes are for.
41582429112_6ab296bcc2_h.jpg


Green / Brown / METRA
40912052074_342d83767e_h.jpg


Truing up the form stands
40730691415_5b0a38f731_h.jpg
 
April 24

Taking out the "bridge" traffic will soon flow through a "tunnel" from Lower Orleans
41760840461_61c0ab2b90_h.jpg


April 25

40861620345_747d152190_h.jpg


April 27

39953003460_af2f3326c4_h.jpg


26892715327_df1faed04e_h.jpg


41719439902_2450b7a629_h.jpg


41760834991_9f9612d6d8_h.jpg
 

Back
Top