Sometimes you just need a little room to work ....

I think I have figured out what the poles and frames are all about. CASE put in the permanent foundation work, but now Walsh needs some temporary work space ... so they build their own.

Sept 22

37399231861_941c7e47f3_h.jpg


Sept 28

Adjusting it ... one end would be lifted slightly and a small crane would tug or push it a bit.
36689876664_dfe0bb7c33_b.jpg


36689876914_cc570e3891_h.jpg


Sept 29

Taking shape
37399226771_fa32ccdfcd_b.jpg


Patching the home-made double beam that has obviously seen use before.
37399223981_97d1be9878_b.jpg


We don't need WD-40 !
The cross members are also re-purposed beams
note how they are welded to the double beams that sit on the capstans on the pounded round pipes.
37399222971_f91052d716_b.jpg


Finally satisfied with the positioning - welding it to the capstan.
23546504538_ed62fc3547_h.jpg


Almost done
23546503818_e4df6321f0_h.jpg


36728765553_6d7e9dc633_h.jpg


36728762423_3d1e5f6072_b.jpg
 
Oct 4

Getting down to that good Chicago clay
36948870553_84c96525eb_h.jpg



36948867273_fede32560a_h.jpg


Follow the yellow plank road ....
36948865063_1c6429a1fe_k.jpg

Word is that this is not extra work space, but an additional road (technically a bridge) for use during construction.


37571083266_60a529351d_h.jpg
]
 
Last edited:
Oct 13

37012924824_c46ca1be92_h.jpg


37722421111_cf34ef6c8f_h.jpg


37012931404_7cf0c02f3c_h.jpg


Oct 14

The view from 150 N River - on a rainy Open House Chicago
37722410851_05d59610ac_h.jpg


Oct 15

37722405691_144046736d_h.jpg


The river is up.
37012911114_165b767a78_h.jpg


Now you can call it a bridge
37012909034_aa2b07b088_h.jpg
 
Nov 10

38290067732_5d4f8c2706_h.jpg


37606074704_fd18191d9c_h.jpg


Getting ready for the next ring of whalers.
37606081944_4c51bece3c_h.jpg


Nov 9

I'm pretty sure there is a strain gauge under this, and a matching one on the other side. The pressure from the clay beyond the sheet piles must be immense.
26547837849_966e265105_h.jpg
 
Nov 17

38475544046_6e38a79c24_h.jpg


Old Pilings - well preserved in the anaerobic clay
38475539106_eb336eedf2_h.jpg

Nov 13

Waiting to be installed - the next set of braces - The square frames are being used to brace the existing garage wall.
37815571054_0c81d774b9_h.jpg

Nov 13

38499598052_34fc22c729_h.jpg


Not the chains used in lifting it out of the pit.
37815568354_f809b0ad52_h.jpg


Strain gauges - must be strain gauges.
38475528456_c78050d50a_h.jpg


38531081611_a1a6a20363_h.jpg
 
Dec 6

24046329067_edf778fe8b_h.jpg


24046316507_62463c3d44_h.jpg


24046338167_091cea3657_h.jpg


The gravel fill from the hole - protects the rebar that is sticking up out of the piling. The top of the rebar will be at or near the top of the foundation mat.
24046333667_f06304acc2_h.jpg


The pink loops are the rebar sticking out of the piling.
24046323547_b20ec5c8b2_h.jpg


24046320877_f1d4b3f6da_h.jpg
 
Dec 19

25305367068_e25dbf9c28_h.jpg


39139859562_4d43cae506_h.jpg


Sleeper in the works ? (note the foundation poking up at the back).
24309600757_6bfd12c2a3_c.jpg


Another foundation pile being un-graveled.
39139858032_fc7eb55a8e_h.jpg


Dec 15

Old wooden pilings - the anaerobic clay preserves the wood very well.
24309604707_3894d8710d_h.jpg


The red wires go to strain gauges on the crossbeams.
25305401368_ecc12afa0f_h.jpg
 
Dec 22

27464430789_a9221a9676_h.jpg


Found where they buried the foundation piers.
27464434699_9fc154e193_h.jpg


A pair of spread footing piers poke their tentacled heads above the clay. Ready for the long sleep(er).
27464426239_86b6b02cdc_h.jpg


38364407955_3e211810e9_h.jpg


One of the rock-socketed piers. I believe the blue wires are for O-Cell testing.
27464416339_af0b661bb2_h.jpg
 
Jan 3

39497468361_c7e1b36ec9_h.jpg


25627157598_b941925278_h.jpg

Note the "bricks" put under the bottom rebar so it is positioned correctly at the bottom of the pour

24630208877_823dfa7517_h.jpg


25627159968_5fc2cc984d_h.jpg
 