dowlingm
Senior Member
A goddamned dogs breakfast is what this surface subway notion is. On Twitter, Steve Munro noted that subway cars are wider than SRT (as is uptown flavour LRT) but the EA drawings for coexistence between GO and TTC tracks north of Kennedy assume SRT allowances.My goodness. They first approved LRT, then subway first 4 stops, then 3, and then 1 and now surface subway. Is this surface subway not really LRT? Although I guess if its an extension from Danforth it needs to remain subway so we never have to heard that dreaded word - transfer. I am glad thats for sure that it is not underground.