What do you think of this project?


  • Total voters
    59
Jan 8 - This rig is just behind the site, but it's not clear what it's doing.

63424
 
@IceDistrict: Want to live in #IceDistrict? News to come on a retail/residential build: 40 storeys w/ grocery & fitness

@Hilman: @IceDistrict only 40? Wasn't this suppose to be 50+?

@IceDistrict: @Hilman_Edmonton It's now going to have fewer storeys than originally planned but will be wider to accommodate

:|
 
Reference ID: Job No 162139487-029
Description: To construct Exterior Alterations to a Mixed Use Tower and add 29 Dwellings in existing space.
Location: 10324 - 103 STREET NW
Plan NB1 Blk 3 Lot 196
10324 - 103 STREET NW
Plan NB1 Blk 3 Lots 183-184,189-195
10324 - 103 STREET NW
Plan NB1 Blk 3 Lots 197-198
10360 - 102 STREET NW
Plan 1321953 Blk 2 Lot 1
10220 - 103 AVENUE NW
Plan 1321953 Blk 2 Lot 2
Applicant: STANTEC ARCHITECTURE LTD.
Status: New
Create Date: 2/8/2016 8:59:25 AM
Neighbourhood: DOWNTOWN
 

Attachments

  • view07_block-g-street-filter1-stamped.1000.jpg
    view07_block-g-street-filter1-stamped.1000.jpg
    192.2 KB · Views: 4,532
  • view14_plaza-chess-filter1-stamped.1000.jpg
    view14_plaza-chess-filter1-stamped.1000.jpg
    249.8 KB · Views: 4,073
  • vw16_plaza-top-stamped.1000.jpg
    vw16_plaza-top-stamped.1000.jpg
    244.5 KB · Views: 4,097
  • vw20_block-ge-stamped.1000.jpg
    vw20_block-ge-stamped.1000.jpg
    205.4 KB · Views: 3,917
  • vw22_block-g-filter1-stamped.1000.jpg
    vw22_block-g-filter1-stamped.1000.jpg
    212.3 KB · Views: 3,884
  • vw27_plazaoutdoormovie-a-stamped.1000.jpg
    vw27_plazaoutdoormovie-a-stamped.1000.jpg
    186.1 KB · Views: 3,755
  • vw29_plaza-event-withoutscreen-stamped.1000.jpg
    vw29_plaza-event-withoutscreen-stamped.1000.jpg
    208.6 KB · Views: 3,612
Job No 189442126-001
Description: To demolish a Fleet Services and Restaurant Use building (GREHOUND BUS DEPOT and A&W).
Location: 10324 - 103 STREET NW
Plan NB1 Blk 3 Lot 196
10324 - 103 STREET NW
Plan NB1 Blk 3 Lots 183-184,189-195
10324 - 103 STREET NW
Plan NB1 Blk 3 Lots 197-198
Applicant: DIALOG
Status: In Development Review
Create Date: 4/1/2016 3:14:26 PM
 
My guess would be tomorrow! I notice that PCL has moved an INDUSTRIAL-sized backhoe adjacent to the site. It appears that the buildings across the alley are getting their windows covered. I hope that PCL removes and replants the trees along 103rd instead of just butchering them in demo-mode. My guess is that they will move very quickly through the excavation phase in an effort to tie in parking under tower "B" -- can't we give this complex a sexy name; how about 'Place Levrette' or 'La Tour sans Gris' -- 'Tower B' is so alphabetical!
 
103 Street Permanent Closure

Impact: Permanent Closure
ON: 103 Street NW
FROM: 103 Avenue NW
TO: 104 Avenue NW
Status: Current
Details: 103 St, 103 Av - 104 Av will be permanently closed to traffic June 1. Sidewalks will also be closed. Detour using 104 St or 101 St. Pedestrians are asked to detour to South side of 103 Avenue.
Starting Date: June 01, 2016
Finish Date:
Activity Type: Construction
Infrastructure: Road and Sidewalk
Disruption Number: 555
 
I hope that PCL removes and replants the trees along 103rd instead of just butchering them in demo-mode.

I'm not sure how that works when a private developer buys an entire public right-of-way from the city, but I'm guessing the cost they paid included the mature trees, as the city is actually pretty good about valuing them. I'll see if I can find out where to direct that inquiry as I'm actually curious about it myself now.

can't we give this complex a sexy name; how about 'Place Levrette' or 'La Tour sans Gris' -- 'Tower B' is so alphabetical!

I imagine a formal name will be announced soon enough.
 

Back
Top