archited
Senior Member
The phone message response -- there is no call throughput -- notes that with the exception of one project (not Emerald) which was sold all other Regency projects are under construction.
Could this mean that their 101 street site was sold and now the only projects they have left are Holyrood and Emerald which are being referred to as under construction?The phone message response -- there is no call throughput -- notes that with the exception of one project (not Emerald) which was sold all other Regency projects are under construction.
So where was the shoring ironIron is on site.
Isn't the Leston building being built behind a collab between Leston and Westrich?Westrich? The plot thickens BIG time..
Nothing says gospel like a "liquor store owner." lol. Query: if Regency has plans to fill up the pit - why not use the free dirt that Leston is pulling out? Kind of defeats the purpose........I walked by at lunch. It looked like they were taking the dirt from the Leston development north and bringing it into the Emerald site.
But then they dirt was also being transfered there into a larger dump truck to haul away.
Also there is a Westrich Pacific trailer on site.
Finally, I asked the owner/worker from the liquor store on this same block if he knew what was going on - he said unfortunately not what he was hoping for. It's his understanding they are just filling in the hole.
Nothing says gospel like a "liquor store owner." lol. Query: if Regency has plans to fill up the pit - why not use the free dirt that Leston is pulling out? Kind of defeats the purpose........