^ If I'm following you correctly, won't the 4th side (south) then be moved & shored on 100ave & the north side taken care of by the soon(ish) to be finished parkade?
 
I suppose but then they’d be digging and shoring 2 separate pits with 1 foot in between them? Why waste all that time, money and material and not just do 1 large pit? I’m not a pit guy, but doesn’t that make sense?
 
I suppose but then they’d be digging and shoring 2 separate pits with 1 foot in between them? Why waste all that time, money and material and not just do 1 large pit? I’m not a pit guy, but doesn’t that make sense?
Cost/cash flow, logistics and lay down space where phase 2 is and the fact that these will often be separately tendered, titled and very much two separate projects even though they by one developer.
 
I suppose but then they’d be digging and shoring 2 separate pits with 1 foot in between them? Why waste all that time, money and material and not just do 1 large pit? I’m not a pit guy, but doesn’t that make sense?
Look back at how they phased and built the parkades for Fox 1 and 2. I imagine this will be a similar process.
 
Raft slab!
DSC01244.JPG
 
Very pleased to see that the laneway is going to get upgraded/repaved as well with this project.

How this is not required by the developer as an offsite levy is beyond me.

Remember how new residents moving into the ICON I and II (and Century) had to pay to improve their 2/10 quality laneway?

Same thing with Symphony Tower.

Augustana repaved a portion of their laneway.

This should be part of the DP and a requirement by the COE to then complete the remainder should it require upgrading as well.

I recall speaking with a planner about this and their comment was that laneways are not heavily used and this was not required...