that is one big parkade for such a short building O_O
One level of public parking maybe?Most 6-storey wood frame buildings are a single level parkade. Not sure I can wrap my head around the math going down two levels with only 95 units. It obviously hurdles for them to be moving forward.
Im also curious about this because the sidewalk covering at the leston site on 116th was also removed, that ones at a similar stage, work hasn’t stopped eitherAll the protective hoarding covering the sidewalk along 100 Ave has been removed.
Is that not still required at this stage of construction?