this is the most recent image that’s still on beljan’s site although - as with the main building - i think there has been more than one iteration.

IMG_9167.jpeg


the foundation piles and piers (and presumably utility connections etc.) were put in last year before the asphalt was put down. the overall project as well as the missing sea cans seems to be quite a bit later than first planned/announced but as far as i know is indeed still “more” than just what’s there now.
 
Last edited:
Is this a fact or just something you're hoping for? It looks pretty much done from what I can tell, other than a stair case likely being needed to those doors
If you're talking about the doors on the second floor of the north side I'm pretty sure those would be access doors to a shipping container which indicates more additions still(Shipping containers)
 