So is it going to be like a two stage climb of the tower? Center core, then rest of the tower structure? All while the podium is being constructed concurrently?
My core belief remains the same re number of floors by Santa-day. If you guys recall, there was a redesign related to how the podium would access Rogers Place. I believe that that re-design, re-pricing, and re-construction prep has necessitated the current strategy.
If that is indeed what they are doing it's a smart move, no reason the tower can't climb whilst they sort out the podium details as it doesn't pertain to the towers structure.
Oct 7: Core now 3 floors up, floor slab forms one level below. Already having an imposing presence on 104 Ave. Along with Edmonton Tower and Rogers Place, the street-level feel here has drastically changed now.
Nice being able to use the sidewalk on 104 Ave again.