Yeah, I think the only thing they changed from the original renders to the model is that the outdoor pool is no longer outdoor. That little triangle extension with the glass you can see the pool through wasn't in the original renders, but that doesn't really work for Edmonton for obvious reasons.
 
Right, my mistake. I forgot about the fact the podium is still being built out of steel. The only difference I see so far is that there are only two columns extending two floors as opposed to four.
 
Apr. 28 - Podium starting to wrap around south side; everything else continues to rise. That's some shiny glass. Tower now about 22 stories up. Three more to go before the floorplate narrows.

P4280635.jpg


P4280666.jpg


P4280670.jpg


P4280671.jpg


P4280672.jpg


P4280673.jpg


P4280674.jpg


P4280675.jpg
 

Attachments

  • P4280666.jpg
    P4280666.jpg
    1.3 MB · Views: 254
  • P4280635.jpg
    P4280635.jpg
    1.3 MB · Views: 256
  • P4280670.jpg
    P4280670.jpg
    1.2 MB · Views: 293
  • P4280671.jpg
    P4280671.jpg
    1 MB · Views: 249
  • P4280672.jpg
    P4280672.jpg
    1,019.2 KB · Views: 258
  • P4280673.jpg
    P4280673.jpg
    1 MB · Views: 236
  • P4280674.jpg
    P4280674.jpg
    1.1 MB · Views: 247
  • P4280675.jpg
    P4280675.jpg
    1.1 MB · Views: 251
DP submitted for the pedway between Edmonton Tower and JW Marriott:

Reference ID: Job No 246493025-001
Description: To construct an addition (pedway) between two approved Buildings.
Location: 10111 - 104 AVENUE NW
Plan 8021480 Blk 1 Lot A
10360 - 102 STREET NW
Plan 1620220 Blk 2 Lot 4
Applicant: STANTEC ARCHITECTURE LTD.
Status: New
Create Date: 4/27/2017 1:37:13 PM
Neighbourhood: DOWNTOWN
 
Looks like the main structural steel for the podium is done as the mobile crane is gone today.
 