What do you think of this project?

  • I neither like nor dislike it

    Votes: 0 0.0%
  • I dislike it

    Votes: 0 0.0%
  • I dislike it a lot

    Votes: 0 0.0%

  • Total voters
    25
Looks like the pedway to Edmonton Tower begins soon:

PERMIT_DATE May 02, 2018
PERMIT_NUMBER 246493025-015
JOB_CATEGORY Commercial Final
ADDRESS 10111 - 104 AVENUE NW
NEIGHBOURHOOD DOWNTOWN
JOB_DESCRIPTION To construct a STRUCTURAL FRAME ONLY for a pedway connecting TOWER D to TOWER AC crossing above grade over 102 Street. (10111-104 Avenue to 10360-102 Street)
BUILDING_TYPE
WORK_TYPE
FLOOR_AREA 1,453.13
CONSTRUCTION_VALUE 5,000
ZONING AED, AED, CCA

PERMIT_DATE May 03, 2018
PERMIT_NUMBER 246493025-012
JOB_CATEGORY Commercial Final
ADDRESS 10111 - 104 AVENUE NW
NEIGHBOURHOOD DOWNTOWN
JOB_DESCRIPTION To construct a Temporary COVERED WAY HOARDING for construction of a pedway connecting TOWER D to TOWER AC crossing above grade over 102 Street. (10111-104 Avenue to 10360-102 Street) VALID 4 May 2018 through 3 August 2018.
BUILDING_TYPE Temporary Structures (999)
WORK_TYPE (01) New
FLOOR_AREA
CONSTRUCTION_VALUE 6,000
ZONING AED, AED, CCA
 
Official topping off ceremony was today.

Prepping on the 24th floor of Edmonton Tower:

P5080663.jpg
P5080667.jpg


P5080647.jpg
P5080648.jpg


On the 46th floor of the tower:

P5080680.jpg
P5080688.jpg
P5080697.jpg
P5080699.jpg
P5080700.jpg
P5080705.jpg
P5080706.jpg
P5080709.jpg
P5080711.jpg
 

Attachments

  • P5080680.jpg
    P5080680.jpg
    154.2 KB · Views: 520
  • P5080699.jpg
    P5080699.jpg
    180.3 KB · Views: 488
  • P5080688.jpg
    P5080688.jpg
    217.7 KB · Views: 498
  • P5080697.jpg
    P5080697.jpg
    177.5 KB · Views: 500
  • P5080648.jpg
    P5080648.jpg
    363.5 KB · Views: 538
  • P5080647.jpg
    P5080647.jpg
    321 KB · Views: 532
  • P5080700.jpg
    P5080700.jpg
    207.3 KB · Views: 578
  • P5080705.jpg
    P5080705.jpg
    280.3 KB · Views: 483
  • P5080706.jpg
    P5080706.jpg
    218.6 KB · Views: 493
  • P5080709.jpg
    P5080709.jpg
    237.7 KB · Views: 508
  • P5080711.jpg
    P5080711.jpg
    283.6 KB · Views: 491
  • P5080663.jpg
    P5080663.jpg
    277.5 KB · Views: 505
  • P5080667.jpg
    P5080667.jpg
    218.4 KB · Views: 534
Tim Shipton, VP Oilers Entertainment Group:

P5080716.jpg


Glen Scott, VP Katz Group:

P5080724.jpg


Martin Stitt, VP Marriott Hotels:

P5080733.jpg


Mayor Don Iveson:

P5080739.jpg
P5080743.jpg


The cake topping ceremony (cake by Whimsical - http://whimsicalcakestudio.ca/):

P5080745.jpg
P5080748.jpg
P5080752.jpg
P5080753.jpg


Views:

P5080757.jpg
P5080760.jpg
P5080758.jpg
 

Attachments

  • P5080716.jpg
    P5080716.jpg
    162.8 KB · Views: 515
  • P5080724.jpg
    P5080724.jpg
    189.1 KB · Views: 467
  • P5080745.jpg
    P5080745.jpg
    215.5 KB · Views: 478
  • P5080739.jpg
    P5080739.jpg
    177.8 KB · Views: 470
  • P5080733.jpg
    P5080733.jpg
    175.9 KB · Views: 504
  • P5080743.jpg
    P5080743.jpg
    169.5 KB · Views: 509
  • P5080752.jpg
    P5080752.jpg
    140.6 KB · Views: 454
  • P5080748.jpg
    P5080748.jpg
    190.6 KB · Views: 467
  • P5080753.jpg
    P5080753.jpg
    180.1 KB · Views: 487
  • P5080757.jpg
    P5080757.jpg
    310.5 KB · Views: 480
  • P5080758.jpg
    P5080758.jpg
    331.3 KB · Views: 457
  • P5080760.jpg
    P5080760.jpg
    353.4 KB · Views: 519
Latest renders:

Vw15_Hotel&Condo-Day-Stamped.jpg
View06-Hotel Entrance - Stamped.jpg


Lobby:

Lobby.jpg


Front desk:

Front Desk.jpg


Meeting/conference area:

Pre Function.jpg


Ballroom:

Ballroom Entrances.jpg
Ballroom.jpg
Ballroom 1.jpg


Jr Ballroom:

Jr Ballroom.jpg


Spa:

Spa.jpg
 

Attachments

  • Jr Ballroom.jpg
    Jr Ballroom.jpg
    135.5 KB · Views: 488
  • Front Desk.jpg
    Front Desk.jpg
    225.9 KB · Views: 495
  • Ballroom 1.jpg
    Ballroom 1.jpg
    200.7 KB · Views: 500
  • Lobby.jpg
    Lobby.jpg
    174.9 KB · Views: 490
  • Ballroom.jpg
    Ballroom.jpg
    211.3 KB · Views: 486
  • Ballroom Entrances.jpg
    Ballroom Entrances.jpg
    149.4 KB · Views: 471
  • Spa.jpg
    Spa.jpg
    119.6 KB · Views: 465
  • Pre Function.jpg
    Pre Function.jpg
    134.6 KB · Views: 491
  • Vw15_Hotel&Condo-Day-Stamped.jpg
    Vw15_Hotel&Condo-Day-Stamped.jpg
    391.7 KB · Views: 475
  • View06-Hotel Entrance - Stamped.jpg
    View06-Hotel Entrance - Stamped.jpg
    260.4 KB · Views: 481
BPs are in for the pedways between Edmonton Tower and JW Marriott, as well as between Stantec and JW Marriott:

PERMIT_DATE May 15, 2018
PERMIT_NUMBER 246493025-002
JOB_CATEGORY Commercial Final
ADDRESS 10111 - 104 AVENUE NW
NEIGHBOURHOOD DOWNTOWN
JOB_DESCRIPTION To construct an addition (pedway) TOWER D (Edmonton Tower) to TOWER AC(Hotel) crossing above grade over 102 Street to connect between two buildings--Plan 8021480, Blk 1, Lot A (10111-104 Avenue) and Plan 1620220, Blk 2, Lot 4 (10360-102 Street).
BUILDING_TYPE Engineering (490)
WORK_TYPE (01) New
FLOOR_AREA 1,065.63
CONSTRUCTION_VALUE 2,075,000
ZONING AED, AED, CCA

PERMIT_DATE May 15, 2018
PERMIT_NUMBER 162139487-094
JOB_CATEGORY Commercial Final
ADDRESS 10220 - 103 AVENUE NW
NEIGHBOURHOOD DOWNTOWN
JOB_DESCRIPTION To construct an addition (pedway) to TOWER E (Stantec) to TOWER AC (Hotel) crossing above grade to connect two buildings (10220 - 103 Ave) and (10360 - 102 Street)
BUILDING_TYPE Engineering (490)
WORK_TYPE (01) New
FLOOR_AREA 1,065.63
CONSTRUCTION_VALUE 1,500,000
ZONING AED, AED, HA
 
All photos taken today. They have taken down the jersey barriers from the 104 Avenue sidewalk. Probably means they're getting ready to reconstruct the sidewalk/public realm!


ICE District by Chris Vazquez, on Flickr


ICE District by Chris Vazquez, on Flickr


ICE District by Chris Vazquez, on Flickr


ICE District by Chris Vazquez, on Flickr


ICE District by Chris Vazquez, on Flickr


ICE District by Chris Vazquez, on Flickr


ICE District by Chris Vazquez, on Flickr


ICE District by Chris Vazquez, on Flickr
 

Back
Top