What do you think of this project?

  • I neither like nor dislike it

    Votes: 0 0.0%
  • I dislike it

    Votes: 0 0.0%
  • I dislike it a lot

    Votes: 0 0.0%

  • Total voters
    14

Daveography

Administrator
Staff member
Member Bio
Joined
Sep 22, 2015
Messages
10,218
Reaction score
23,075
A SAMU BUILDING IS COMINGBE PART OF THE MOVEMENT
MacEwan is growing.

Over the past few years, MacEwan University’s campuses have been centralizing into a single, all-encompassing downtown location. With this centralization has come more programs and more people.

The buildings on MacEwan’s downtown campus can’t serve the needs of our student population: there’s just not enough space. If you’ve ever tried to find a spot to study at lunch, you’ll know what we mean.

The Students' Association of MacEwan University wants to open a new building on campus, dedicated to students: it’ll have space for clubs; new food places that have fresh, local food; a 24-hour study space; and plenty of electrical outlets for laptops—maybe even the ones with the USB plugs built right in.

Fall_Fest_Stantec_Images_Page_011.jpg
Screen-Shot-2015-10-27-at-11.33.20-AM.png
Screen-Shot-2015-10-27-at-11.35.32-AM.png
Screen-Shot-2015-10-27-at-11.35.43-AM.png
Screen-Shot-2015-10-27-at-11.35.54-AM.png
Screen-Shot-2015-10-27-at-11.36.06-AM.png
Screen-Shot-2015-10-27-at-11.36.29-AM.png


http://samubuilding.ca/
 

Attachments

  • Fall_Fest_Stantec_Images_Page_011.jpg
    Fall_Fest_Stantec_Images_Page_011.jpg
    2.2 MB · Views: 1,623
  • Screen-Shot-2015-10-27-at-11.33.20-AM.png
    Screen-Shot-2015-10-27-at-11.33.20-AM.png
    2 MB · Views: 1,529
  • Screen-Shot-2015-10-27-at-11.35.32-AM.png
    Screen-Shot-2015-10-27-at-11.35.32-AM.png
    1.6 MB · Views: 1,337
  • Screen-Shot-2015-10-27-at-11.35.43-AM.png
    Screen-Shot-2015-10-27-at-11.35.43-AM.png
    2 MB · Views: 1,457
  • Screen-Shot-2015-10-27-at-11.35.54-AM.png
    Screen-Shot-2015-10-27-at-11.35.54-AM.png
    1.3 MB · Views: 1,416
  • Screen-Shot-2015-10-27-at-11.36.06-AM.png
    Screen-Shot-2015-10-27-at-11.36.06-AM.png
    1.9 MB · Views: 1,379
  • Screen-Shot-2015-10-27-at-11.36.29-AM.png
    Screen-Shot-2015-10-27-at-11.36.29-AM.png
    1.2 MB · Views: 1,302
Reference ID: Job No 180144578-002
Description: To construct a Public Education Services Use building with Specialty Food Services (main and second floor) and General Retail Stores (main floor) - (Student Association Building).
Location: 10700 - 104 AVENUE NW
Plan 1025859 Blk 20 Lot 100
Applicant: STANTEC ARCHITECTURE LTD, FREDERIC BRISSON
Status: New
Create Date: 1/16/2017 4:17:21 PM
Neighbourhood: DOWNTOWN
 
From the EDC Minutes:

C.2. Students’ Association of MacEwan University (SAMU) Building
Stantec - Leo Lejeune and Frederic Brisson

F. Cavaliere and H. Mapstone left the meeting due to a conflict of interest with item C.2.
P. Speary read the comments of the Development Planner.
MOVED: D. Deshpande
MOTION OF: Support with conditions (administrative walk-on)
● Provide more direct access for all levels of accessibility on the corner of 109th Street and 104th Avenue to the south entrance
● Include a comprehensive signage package
SECONDED: G. Renwick
CARRIED
FOR THE MOTION: C. Craig, D. Deshpande, C. Domanski, M. Figueira, S. Kaznacheeva, R. Labonte, G. Renwick, A. Rowe, W. Sims

https://www.edmonton.ca/city_government/documents/EDCMinutesFeb7.pdf
 
SAMU groundbreaking ceremony & renders reveal (part I):

P4070373.jpg
P4070374.jpg
P4070375.jpg
P4070377.jpg
P4070486.jpg
P4070404.jpg
P4070379.jpg
P4070378.jpg
P4070487.jpg
P4070382.jpg
 

Attachments

  • P4070373.jpg
    P4070373.jpg
    823.3 KB · Views: 1,078
  • P4070374.jpg
    P4070374.jpg
    796 KB · Views: 1,176
  • P4070375.jpg
    P4070375.jpg
    709 KB · Views: 980
  • P4070377.jpg
    P4070377.jpg
    820.9 KB · Views: 1,118
  • P4070486.jpg
    P4070486.jpg
    864 KB · Views: 1,030
  • P4070404.jpg
    P4070404.jpg
    805.9 KB · Views: 990
  • P4070379.jpg
    P4070379.jpg
    917.3 KB · Views: 1,014
  • P4070487.jpg
    P4070487.jpg
    1.1 MB · Views: 1,049
  • P4070378.jpg
    P4070378.jpg
    1 MB · Views: 998
  • P4070382.jpg
    P4070382.jpg
    996.1 KB · Views: 1,016
P4070416.jpg


SAMU Student Council member Tansy Spyker:
P4070392.jpg

Campus Elder Rick Lightning performs a song:
P4070407.jpg


Alberta Minister of Advanced Education Marlin Schmidt:
P4070417.jpg


City Councillor (Ward 6) Scott McKeen:
P4070427.jpg


(Unfortunately I can't recall her name or position)
P4070429.jpg


David Atkinson, outgoing MacEwan University president:
P4070437.jpg


SAMU President (outgoing) Danika McConnell:
P4070449.jpg
P4070475.jpg

Construction begins next month, completion for 2019 I believe it was.
 

Attachments

  • P4070437.jpg
    P4070437.jpg
    852.2 KB · Views: 1,046
  • P4070427.jpg
    P4070427.jpg
    753.1 KB · Views: 1,060
  • P4070429.jpg
    P4070429.jpg
    1.3 MB · Views: 1,072
  • P4070449.jpg
    P4070449.jpg
    904.3 KB · Views: 1,149
  • P4070475.jpg
    P4070475.jpg
    1 MB · Views: 1,024
  • P4070407.jpg
    P4070407.jpg
    857.2 KB · Views: 1,002
  • P4070392.jpg
    P4070392.jpg
    1.2 MB · Views: 1,091
  • P4070416.jpg
    P4070416.jpg
    1.3 MB · Views: 1,053
  • P4070417.jpg
    P4070417.jpg
    918.3 KB · Views: 1,044
SAMU Breaks Ground on New Student Building
by Shauntae on Apr 7th, 2017

SAMU Continues to Build Momentum…
A dream that has been almost a decade in the making making is finally coming true! It started with mere conversations years ago – What if SAMU had its own building? Fast forward to today, and SAMU, in partnership with MacEwan University, is thrilled to announce that these conversations have turned into reality and we are getting a new home! Complete with more study space, more space clubs, food options and more room for your favourite programs and services, the new student building is going to built just east of 109th street and is slated to open in Fall 2019.

Five years ago, SAMU recognized that in order to reach our full potential and offer students more support, we needed our own space. With student needs at the forefront, SAMU’s student leaders moved ahead with the project. In October of 2015 we held a building referendum, which saw students voting overwhelmingly in favour of the new building. This is an exciting venture for both SAMU and MacEwan as we are able to grow with the downtown core and offer our students a greater voice on campus.

This new building will mean room for SAMU to expand our programs and services and create more awareness for what we have to offer students. For students, this will mean they have their own space on campus and a legacy to leave behind. We look forward to the new building and all the exciting opportunities it’s going to bring!

Building1-1-1024x429.jpg
Building2-1024x641.jpg
Building3-1024x579.jpg
Building4-1024x520.jpg


https://samu.ca/2017/04/samugroundbreaking/
 

Attachments

  • Building1-1-1024x429.jpg
    Building1-1-1024x429.jpg
    54.5 KB · Views: 1,273
  • Building2-1024x641.jpg
    Building2-1024x641.jpg
    115 KB · Views: 1,083
  • Building3-1024x579.jpg
    Building3-1024x579.jpg
    105.9 KB · Views: 1,043
  • Building4-1024x520.jpg
    Building4-1024x520.jpg
    97.7 KB · Views: 1,063

Back
Top