Especially with some that are in council who will always cheap out because they claim to be fiscally responsible. Oh and then there are the others that trust cuty administration 100% and don't question anything that administration says.Again, a Capital cost versus Operational Cost equation! Should be easy to solve, but apparently not for the City "leaders".
The Metro Line extension from NAIT into Blatchford has started construction. This includes hard surface and removal of unsuitable materials, site grading, reconfiguration of 109 Street and the Jefferson Armoury parking lot, and installation of underground utilities.
Alstom Transport Canada Inc. has been retained to complete the detailed design and installation of an alternative signalling plan to replace the Thales signalling system. The material procurement is complete. The design work, and hardware and software installation are being finalized, and system testing is ongoing. Transition to the replacement signalling system is currently scheduled for Q1 2021.
Description: Construct FOUNDATION ONLY Blatchford Gate Utility Complex LRT in ROW
Permit date: November 17, 2020
Type: Building Permit
Subtype: (04) Footing & Foundation
Category: Commercial Final
Class: Utility Buildings (480)
Status: Issued
Address: 101 - AIRPORT ROAD NW
Neighbourhood: BLATCHFORD AREA
Zoning: MA2, MA, MA3, MA2, MA3, MA2, MA, US, MA2, PU, BRH, BLMR, BLMR, BRH, BLMR, MA, PU, BRH, BP, BLMR, BLMR, MA1, UI
Value: $14,999.00