C.2. Enbridge Tower (Development Permit)
Maria Spengler - Davignon Martin
MOVED: R. Labonte
Motion to table
SECONDED: M. Figueira
As determined by the Edmonton Design Committee at the meeting on March 12, 2019,
the project has been tabled as a number of items were deficient or require further
resolution. The Committee generally supports the adaptive reuse of this iconic building;
however, the package and presentation did not clearly communicate the current iteration
of the design to a level of refinement expected of a formal development permit
submission.
● The tower top is unresolved relative to glazing, materiality, design detail, signage and
lighting.
● Please confirm how the auxillary loading space on 102 Street is to function.
● No information has been provided on the screening of the mechanical units on the
podium roof
● More information on lighting, particularly at street level, is required; eg. location,
type, colour, mounting / integration with facade.
● The submission lacked a physical material sample board. As a result, the Committee
was not able to understand the material quality of proposed finishes. Furthermore,
the submission package did not include annotated, colour renderings - it was therefore
difficult for the Committee to adequately evaluate the proposed design in this regard.
● No information was provided on the south (lane) elevation. All elevations (including
tower and tower top) should be illustrated and annotated in the manner included in the
presentation.
● It is the understanding of the Committee that the streetscape will be addressed
through a separate permit process; the Committee therefore requires confirmation that
this submission will also be reviewed by EDC.
Furthermore, the Committee notes that this project could have benefitted from an
Informal Pre-Consultation, and encourages the Applicant to take advantage of this
opportunity for future projects.
CARRIED
FOR THE MOTION: R. Labonte, W. Sims, T. Antoniuk, S. Kaznacheeva, A. Zepp, D.
Brown, J. Mills, M. Figueira, D. Deshpande
https://www.edmonton.ca/city_govern...ontonDesignCommittee_Minutes_March12_2019.pdf
Maria Spengler - Davignon Martin
MOVED: R. Labonte
Motion to table
SECONDED: M. Figueira
As determined by the Edmonton Design Committee at the meeting on March 12, 2019,
the project has been tabled as a number of items were deficient or require further
resolution. The Committee generally supports the adaptive reuse of this iconic building;
however, the package and presentation did not clearly communicate the current iteration
of the design to a level of refinement expected of a formal development permit
submission.
● The tower top is unresolved relative to glazing, materiality, design detail, signage and
lighting.
● Please confirm how the auxillary loading space on 102 Street is to function.
● No information has been provided on the screening of the mechanical units on the
podium roof
● More information on lighting, particularly at street level, is required; eg. location,
type, colour, mounting / integration with facade.
● The submission lacked a physical material sample board. As a result, the Committee
was not able to understand the material quality of proposed finishes. Furthermore,
the submission package did not include annotated, colour renderings - it was therefore
difficult for the Committee to adequately evaluate the proposed design in this regard.
● No information was provided on the south (lane) elevation. All elevations (including
tower and tower top) should be illustrated and annotated in the manner included in the
presentation.
● It is the understanding of the Committee that the streetscape will be addressed
through a separate permit process; the Committee therefore requires confirmation that
this submission will also be reviewed by EDC.
Furthermore, the Committee notes that this project could have benefitted from an
Informal Pre-Consultation, and encourages the Applicant to take advantage of this
opportunity for future projects.
CARRIED
FOR THE MOTION: R. Labonte, W. Sims, T. Antoniuk, S. Kaznacheeva, A. Zepp, D.
Brown, J. Mills, M. Figueira, D. Deshpande
https://www.edmonton.ca/city_govern...ontonDesignCommittee_Minutes_March12_2019.pdf