What do you think of this project?


  • Total voters
    64
LOL, ok. We don't have a 'shame' factor anymore in our society, which leads to a lack to responsibility. Listen, let me tell you, i LIVE a life of trauma. But I don't use that as a crux to do harm to myself or my city. And for those with addiction, what is human suffering is allowing an addict choose for themselves, if they want treatment. Of course they won't, they're addicts. If compelled treatment is a step that has to be taken, then so be it.

And it should be known, even among the vulnerable, there are people who are just plain ass.... Just like middle class or rich people can be ass..... My point is they don't want help, they don't wanna play by the rules. Take them away. I don't care what lemon life handed them. My time for compassion is over.
 
^ Very few people are pro-social disorder
I can think of at least two here in Vancouver. VANDU, who took government money to fund hard drug use. Then there's the Pivot Law Society, which recently released "Talking Back to the City: A manual for winning — and resisting — local drug policy."
 
The City of Edmonton should replace the high level bridge if it wants transformation. A modern bridge with two way traffic would link the north and south sides better and promote economic development. Right now there's basically a north side economy and a south side economy because of the poor north south transportation corridor. For many living on the south side it's too much of a hassle to get downtown. The mirror that's in use on the high level - that's from the farm isn't it? After the LRT expansion, maybe the bridge is next if the the money isn't squandered on bicycle paths that almost nobody uses for 8 months of the year.
 
What are these?

Glad you asked that. I was of the understanding - and I thought I read it on this forum - that three residential Ice District projects will be expedited and completed by 2028. But I'm not seeing that in any articles.

This one when the deal was announced says OEG residential would begin likely by 2028.

From Gerein:
"Building on 14 towers is expected to start in 2028 and finish 10 years later — I would be skeptical of that timeline"

I thought I read somewhere that OEG would be required to start projects right away. I guess just wishful thinking on my part.
 
You’re right! OEG is obligated to finish 3 towers by 2028. There is a bunch of literature out there saying so. I know the province published a story on it
I haven't seen any geotechnical work being conducted in this area as of yet, unless decent studies already exist.
 
I'm sure geotechnical will happen in due time....no exact details have been released yet...
 
I'm sure geotechnical will happen in due time....no exact details have been released yet...
Just thinking if they haven't done geotechnical yet, engineering hasn't even started in earnest. Project completion by 2028 is pretty tight, especially with procurement timelines like they are now.
 
Just thinking if they haven't done geotechnical yet, engineering hasn't even started in earnest. Project completion by 2028 is pretty tight, especially with procurement timelines like they are now.
Geotech would be part of the infrastructure funding the GOA and City are kicking in for the village. Until the master agreement is signed, I can't see anything starting. Too much risk to start now if Council doesn't approve the agreement or sends it back to admin for more updates. The MOU isn't a binding agreement.
 
The City of Edmonton should replace the high level bridge if it wants transformation. A modern bridge with two way traffic would link the north and south sides better and promote economic development. Right now there's basically a north side economy and a south side economy because of the poor north south transportation corridor. For many living on the south side it's too much of a hassle to get downtown. The mirror that's in use on the high level - that's from the farm isn't it? After the LRT expansion, maybe the bridge is next if the the money isn't squandered on bicycle paths that almost nobody uses for 8 months of the year.
Hey @Out of Towner ... GET OUTTA TOWN!!!

lol jk, but seriously, replacing one of Edmonton's most iconic structures is definitely not the answer. I agree that vehicle connection is not ideal, and perhaps a new bridge (somewhere.... not near the high level....) or updated thoroughfare is needed to improve connectivity between the two very urban sections of the city. But I don't think it would be transformative in the sense that investment would come flooding in just becasue transportation has improved.
 
The City of Edmonton should replace the high level bridge if it wants transformation. A modern bridge with two way traffic would link the north and south sides better and promote economic development. Right now there's basically a north side economy and a south side economy because of the poor north south transportation corridor. For many living on the south side it's too much of a hassle to get downtown. The mirror that's in use on the high level - that's from the farm isn't it? After the LRT expansion, maybe the bridge is next if the the money isn't squandered on bicycle paths that almost nobody uses for 8 months of the year.
I definitely agree that there needs to be a new High Level Bridge to better link the economies of Old Strathcona and Downtown, but there is no need to tear the old bridge down. There's enough space east of the existing bridge to build a new bridge connecting 109th Street on a straighter alignment (it would cut through the Kinsmen soccer field and the western edge of the Legislature grounds, but still worth it), where you could run two-way vehicle traffic, intercity trains and potentially another cross-river LRT alignment. Then, you keep the old bridge for cyclists, pedestrians and the streetcar.
 

Back
Top