Airboy
Senior Member
I noticed that they were installing new Screening on the upper northwest side of Telus last week. I wonder if the crane shift is to complete the work.
Has anyone got a grip on precisely what is going on here?
During my days as a balancer. There was major changes when the switch gear was converted to digital. And there were teleconference suite developed. But that was years ago. The HVAC was old then and we were pushing the maximum air capacity. As they added more digital equipment the cooling was pretty much at maximum capacity and was inadequate.