Some shots from today. Not pictured is the new connection with SAB currently under construction — it looks to be a two storey link.
I do not believe the tunnel was ever done. Only the utility tunnels are there.Will this building finally connect to the LRT station? The original plan for University LRT had tunnel connection from DP through the station to Education.
Thought they might finally do it with the renosI do not believe the tunnel was ever done. Only the utility tunnels are there.
As far as grafted on future blocks? I'm loving it! The pattern on the glass really gives it a pop that otherwise would look like a standard Edmonton Moderne addition.. Well done!Some shots from today. Not pictured is the new connection with SAB currently under construction — it looks to be a two storey link.