Two days of expected work turned into a week; one equipment breakdown cascaded into another; a 30-minute delay became 24 hours. The challenges of keeping a bridge demolition project on the schedule are not unique, Bridge No. 92297 was a monolithic, single-span, reinforced concrete flat slab deck with vertical abutments supported on reinforced concrete strip footings, constructed in 1912 (Figure 1). It was oriented on a 35-degree skew, measured 49 feet in total length, and had a clear span of 41 feet with a 60-foot-wide deck. Anyone knows the Background of this project?Need to check on it for a research
 