sorry, dumb question: I though ice was going to occupy the whole lot. What's going to happen to the land the sales centre sits on?

the 2 ICE condo towers will occupy southern 2/3 of the site, the remaining northerly 1/3 will be a 31 storeys office building (hopefully they stick to the plan and actually build it)
 
And what about the lot to the West (on Simcoe)?

Infinity Ph 3 & 4 on the lot west of Ice

once rumoured Fairmont Hotel (with offices and condos maybe)

See thread:
Block 7B, Bremner @ Lower Simcoe (GWL/bcIMC Hotel/Rental/Office, 26 + 50s, P+S/IBI)

The most recent plan the "Fairmont Site" on the NE corner of Simcoe and Bremner (link above) is for 2 buildings: one office building ~ the same height, floor area as 18 York; the second building being a hotel and high-end rental residential dwelling units.
 
Last edited:
ICE - Gettinghawt!!!!!!

sany0971.jpg


The Rigging is Beginning !!!

sany0969.jpg


Video by me

[video=youtube;Zm1ogy8pLFk]http://www.youtube.com/watch?v=Zm1ogy8pLFk[/video]
 
Last edited:
Freshly painted too!
 
looks like that video also shows Infinity is getting dug along side the same time as ICE - probably cheaper (less equipment being moved around).
 
looks like that video also shows Infinity is getting dug along side the same time as ICE - probably cheaper (less equipment being moved around).

Two different sites. Two different companies. Two different construction crews. The site is divided, and as far as construction goes, could be located on opposite ends of the city.
 
From WhipperSnapper at SSP:

more floors proposed for Ice ... 234m and 202m

Was at 222m / 65 floors and 192m / 55 floors. 234m = 68 floors, 202m = 58 floors?
 
Last edited:

Back
Top