drum118
Superstar
Dec 15
A underpass is to be built under a new street between the 2 site, with a temporary bridge over the opening. Shoring has been removed on this side and being remove on the other side.
A underpass is to be built under a new street between the 2 site, with a temporary bridge over the opening. Shoring has been removed on this side and being remove on the other side.