RPM

New Member
Member Bio
Joined
Apr 24, 2007
Messages
52
Reaction score
2
These buildings are to be built to ensure 100% access for people with disabilities.
Located next to the Pickering Town Centre
 
Some renderings from their website.

174072



174073



174074



174075
 
Wow these are great for Pickering. So many projects for them. So exciting. Some great projects for the city
 
Looks like that terrible architecture is gone and a new architect is in place now, Quadrangle tweeted this today:

E1D3A7DB-ADC5-4337-8CA0-DA26A3660A5B.jpeg
 
I know off topic, but I didn't see the major build at city centre/downtown (area at and around Sears wing of Pickering Town Centre that was demolished) . Is there a thread for that?
 
here
 
Thanks didn't see it on the map!

Also of note on the above application... There is planned, long term (beyond 2031), to have an overpass connecting Bayly St and the new downtown just east of this site (Hydro Corridor). I found it interesting they didn't seem to include this in their reports; perhaps because it is beyond 2031 and not quite known? Their traffic analysis goes as far as the 10 year outlook post expected completion (2027).

From the Durham Region Transportation Plan:
Web capture_27-1-2023_133732_durhamtmp.files.wordpress.com.jpeg


And from their traffic study:
1674844554804.png
 
I also heard in the last council meeting (from the mayor) they are trying to also get a pedestrian Bridge from Universal city across the 401 to the new 'downtown'. Not sure if misspoke or related to the overpass mentioned above...
 

Back
Top