Only a couple more black garbage bag rows left!
4C8FE637-8332-46FA-AE7F-44B92EE70755.jpeg


21586A19-2877-4920-AD46-42A93AEDE30E.jpeg
 
Speaking of perpetual temporary platforms...I wonder if CF have resolved potential BMU issues that the L Tower was having? Since being similar in shape and all...
There will be quite a substantial BMU tucked into the sloping top of this building. There is a much larger floor-plate on this building than the L Tower, so space for larger equipment, and the cranes are not positioned in such a way as to make lifting the pieces into place impossible, as in the original L Tower plan.

42
 
There will be quite a substantial BMU tucked into the sloping top of this building. There is a much larger floor-plate on this building than the L Tower, so space for larger equipment, and the cranes are not positioned in such a way as to make lifting the pieces into place impossible, as in the original L Tower plan.

42
Thank you for explaining that.

...and also hopes for another man-in-the-red-jacket tour of the top mechanical here, as we just saw with the bottom retail of The One for the size referencing and awe. <3
 
I wonder what sort of retail is planned for the base? Hopefully something in addition to a sandwich and coffee shop. ☕
 

Back
Top