Apr 3, 2023


7296D613-7EB3-4923-A621-DC31428D989C_1_201_a.jpeg



99C33091-3C20-45E2-B69C-64DCFBDFBE21_1_201_a.jpeg



48C1E2C7-13F3-4E2C-AA69-24AAC2799435_1_201_a.jpeg



69B1D51B-6BBF-4322-BEE1-16545479A885_1_201_a.jpeg



69E281F2-7E50-41CF-8145-BE8A2A84D0C6_1_201_a.jpeg



ACDE1C6C-422C-421A-8341-2AFCC3375336_1_105_c.jpeg
 

Attachments

  • 7296D613-7EB3-4923-A621-DC31428D989C_1_201_a.jpeg
    7296D613-7EB3-4923-A621-DC31428D989C_1_201_a.jpeg
    266.3 KB · Views: 80
  • 7296D613-7EB3-4923-A621-DC31428D989C_1_105_c.jpeg
    7296D613-7EB3-4923-A621-DC31428D989C_1_105_c.jpeg
    251.7 KB · Views: 82
  • 7296D613-7EB3-4923-A621-DC31428D989C_1_105_c.jpeg
    7296D613-7EB3-4923-A621-DC31428D989C_1_105_c.jpeg
    251.7 KB · Views: 92
Lots of work going on in various areas of the building - the basement has been dug out and repairs to the basement walls taking place, new windows are going in, new structures behind the original building continue to be developed.

Some photos from today. First, a view from the front, with the basement window showing clear through to the area behind the building. Second photo below is a detail of the open window with the view right through the basement.

20230419_153525.jpg


20230419_153542.jpg


Work going on both the rear basement wall, and of a new structure behind the building.

20230419_153404.jpg


20230419_153224.jpg


20230419_153313.jpg
 

Back
Top